Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Civil Engineering
  5. ›RFP Bighorn River - 1M W Bighorn 9991000

Montana Department of Transportation (MDT)·Montana

RFP Bighorn River - 1M W Bighorn 9991000

Closes 2/11/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Montana Department of Transportation (MDT) is accepting proposals from consulting firms interested in the preparation of the construction plans and specifications for the Bighorn River – 1M W Bighorn project. The project will replace/rehabilitate a pair of existing structures on I-94, including an Eastbound Structure and a Westbound Structure. The project may include roadway design, traffic engineering, operations analysis and design, geotechnical investigation, analysis, and design, survey, environmental evaluation and permitting, bridge design, hydraulics analysis and design, and local agency and other stakeholder coordination. • The project is expected to be completed in a timely manner, with a project schedule to be developed and negotiated prior to executing the contract agreement. • The selected consultant will be required to have an internal quality assurance/quality control process achieving industry standard expectations for quality. • The consultant will be required to provide a proposal that includes team qualifications, project approach, and past performance information. • The evaluation of proposals will be based on factors including team qualifications, project approach, and record of past performance. • The contract agreement will be administered on a cost-plus fixed fee basis, with negotiated cost ceilings.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelly Williams(Consultant Design Engineer)

[email protected]

(406) 444-7964

Key dates

Opened
1/8/2026
Closes
2/11/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
MDT-RFP/RFQ-2026-2148

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is not explicitly stated in the document. However, based on the scope of the project, which includes the preparation of construction plans and specifications for the Bighorn River – 1M W Bighorn project, the budget could be substantial. The project involves replacing and rehabilitating existing structures on I-94, which could require significant engineering and construction services. The budget could be influenced by factors such as the complexity of the project, the experience and qualifications of the selected consultant, and the negotiated cost ceilings. A rough estimate for the budget could be in the range of $500,000 to $2 million, considering the scope and complexity of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washakie County Conservation District·Wyoming

Top match · 66%

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Little Blue NRD·Nebraska

63% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Laramie Rivers Conservation District·Wyoming

60% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·United States of America

60% match

30--BELLOWS,PRESSURE

Closes 11/4/2026Opened 10/25/2026

California Department of Water Resources·California

60% match

Real-Time River Forecasting System

Closes 11/23/2026Opened 10/19/2026

City of Red Oak·Texas

60% match

12-Inch and 10-Inch Carson Street Water Lines

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

Texas Department of Transportation·Texas

60% match

STATE LET CONSTRUCTION CONTRACT, RANDALL CO, BRIDGE MAINTENANCE

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

Texas Brazos River Authority·Texas

60% match

RFP EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

Closes 11/3/2026Opened 8/3/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

60% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

City of Austin·Texas

59% match

Gilleland Wastewater Interceptor

Rolling / TBD closeOpened 8/17/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

City of Gould·Arkansas

59% match

RFP # 24RU40001 – Contract C – Water Meters

Closes 11/2/2026Opened 10/18/2026

Texas Parks & Wildlife Department·Texas

59% match

Aerial Fixed-Wing Surveys and Telemetry Services

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026