Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›Parapet Wall Replacement at Congress Ave & Washington Ave

City of Waterbury·Connecticut

Parapet Wall Replacement at Congress Ave & Washington Ave

Closes 9/16/2026$500k – $1.5MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This municipal construction project requires the removal of an existing parapet wall and the installation of a new parapet with simulated stone masonry at the intersection of Congress Avenue and Washington Avenue in Waterbury, CT. The scope also includes installing black metal hand‑railings, replacing three sets of granite steps with new concrete steps, reconstructing the existing concrete ramp, widening the sidewalk, and performing miscellaneous roadway reconstruction to improve safety for pedestrians and vehicles. A mandatory on‑site information session must be attended for any bidder. • Construct new parapet wall with simulated stone masonry to prevent vehicles from crossing onto Washington Ave. • Install black metal hand‑railings and replace granite steps with concrete steps. • Replace concrete ramp, widen sidewalk, and perform related roadway reconstruction. • Mandatory pre‑bid information session on 31 August 2026 at the project site.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
8/21/2026
Questions due
9/3/2026
Pre-bid meeting
8/31/2026Mandatory
Closes
9/16/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
8918

Budget estimate

$500,000 – $1,500,000

Based on typical municipal sidewalk and parapet wall projects of this size, a rough cost range would be between $500,000 and $1,500,000. The lower bound assumes modest material costs (concrete, simulated stone veneer, basic railings) and limited demolition, while the upper bound accounts for higher‑end stone‑look finishes, extensive roadway reconstruction, and contingency allowances. Local labor rates in Connecticut and the need for traffic control also push the estimate upward.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washington DC Transportation (DDOT)·District of Columbia

Top match · 66%

Sign Structure and Upgrade Replacement

Closes 11/16/2026Opened 10/14/2026

Mansfield Housing Authority·Massachusetts

64% match

Courtyard Renovation: Doors, Storms, Painting & Railing Replacement

Closes 11/4/2026Opened 8/26/2026

Connecticut City of Norwalk·Connecticut

64% match

TMP2026-2 Embankment Wall Replacement – Lowe Street

Closes 11/17/2026Opened 10/21/2026

City of Sunrise·Florida

63% match

West Oakland Park Blvd Wall Repairs

Closes 11/17/2026Opened 10/16/2026

City of Santa Ana·California

63% match

Santa Ana Zoo Wall

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·New York

63% match

Building 13 Stair and Roof Replacement at Castle Point VAMC

Closes 11/4/2026Opened 10/1/2026

City of Charleston·South Carolina

63% match

Rehabilitation of 182 Congress St.

Closes 12/2/2026Opened 10/29/2026

Charleston·South Carolina

63% match

26-B025R Rehabilitation of 182 Congress Street

Closes 12/2/2026Opened 10/30/2026

City of Plano·Texas

62% match

Screening Wall Requirements-2026 PW-S-00010

Closes 11/9/2026Opened 10/19/2026

City of Cincinnati·Ohio

62% match

Sycamore Street Retaining Wall PID 122597

Closes 11/6/2026Opened 10/9/2026

Texas Williamson County·Texas

62% match

Brushy Creek Trail Retaining Wall

Closes 11/23/2026Opened 10/12/2026

City of Fort Wayne·Indiana

62% match

0792D - Alley N-S: Lenox Ave, W Fairfax Ave, Buell Dr, Fairfield Ave

Closes 11/5/2026Opened 10/23/2026

U.S. Department Of Veterans Affairs·Oregon

62% match

Z2DA--692-26-201 Refresh Halls and Walls throughout Campus

Closes 11/3/2026Opened 10/16/2026

City of Shawnee·Kansas

62% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

Ohio Department of Natural Resources·Ohio

62% match

PWC LE Wall and Ventilation Repair

Closes 11/6/2026Opened 10/9/2026

City of Sandy·Utah

61% match

CITY HALL WEST STAIR REPLACEMENT, ADA RAMP & WEST/NORTH LANDSCAPE REDESIGN

Closes 11/6/2026Opened 10/23/2026

Delaware County·Pennsylvania

61% match

Delaware County Courthouse Façade Stabilization – Phase 1 (eDPW-120926)

Closes 12/9/2026Opened 10/15/2026

Illinois THA - Toll Highway Authority·Illinois

61% match

I-21-4738 - EWO #72 - ATP #58 - I-490 Railroad Track Relocation and Retaining Wall

Closes 11/5/2026Opened 10/13/2026

City of Columbus – Department of Finance and Management·Ohio

61% match

Public Safety Facilities Structural Remediation – 2077 Parkwood & 724 E Woodrow

Closes 11/6/2026Opened 10/19/2026

City of Charlotte·North Carolina

61% match

Wood Dale Ter 2022 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/23/2026

City of Cincinnati Department of Transportation and Engineering·Ohio

61% match

Sycamore Street Retaining Wall PID 122597

Closes 11/6/2026Opened 10/9/2026

People with Developmental Disabilities, NYS Office for·New York

61% match

CEMENT BLOCK WALLS - Heritage IRA

Closes 11/13/2026Opened 10/21/2026

The City of Columbus·Ohio

61% match

RFQ033899 - Safety Facilities Remediation-2077 Parkwood / 743 E Woodrow

Closes 11/4/2026Opened 10/20/2026

City of Ely, MN·Minnesota

61% match

City Hall – Building Envelope Improvements and Stair Repairs

Closes 11/10/2026Opened 10/16/2026

City of Seattle·Washington

61% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026