Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Chelsea DC - Chilled Water piping Taps

Massachusetts Trial Court·Massachusetts

Chelsea DC - Chilled Water piping Taps

Closes 10/23/2026$150k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Commonwealth of Massachusetts Trial Court is seeking a qualified contractor to install chilled‑water piping taps that will enable a temporary rented chiller to interface with the existing chilled‑water system at the Chelsea District Court building (120 Broadway, Chelsea, MA 02150). The work includes removing existing 90° elbows, installing two 8‑inch tees with flange sets, providing gear‑operated 8‑inch butterfly valves, adding blind‑flange plates, installing reducing‑flange adapters, performing leak testing, and applying insulation only to the newly installed sections. All labor, equipment, materials, permits, and required inspections must be supplied by the vendor, and the work must be performed during regular business hours in compliance with EPA, OSHA, and Massachusetts prevailing‑wage requirements. • Mandatory site visit scheduled for the week of Oct 13‑16 2026. • Bid must be submitted electronically via COMMBUYS by Oct 23 2026 12:00 PM. • Contractor must provide all required licenses, insurance, OSHA certifications, and a 50 % payment bond if contract value exceeds $25,000. • Scope limited to chilled‑water piping modifications; no additional building or system upgrades are included.

Attached files

Contact

Tom Prentiss(Info Contact)

(857) 895-1454

Key dates

Opened
10/5/2026
Site visit
10/13/2026Mandatory
Closes
10/23/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
BD-27-1107-FREG5-ACCOU-133920

Budget estimate

$150,000 – $300,000

Based on typical rates for mechanical‑plumbing work in Massachusetts, a full‑scope installation of two 8‑inch tees, butterfly valves, blind plates, adapters, leak testing, and insulation at a municipal building usually ranges from $150 k to $300 k. The lower end reflects a straightforward install with minimal unforeseen conditions; the higher end accounts for higher labor rates due to prevailing‑wage requirements, potential overtime, and the need for a 50 % payment bond.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Chelsea Housing Authority·Massachusetts

Top match · 67%

Plumbing

Closes 11/18/2026Opened 10/8/2026

U.S. Department Of Veterans Affairs·Delaware

66% match

Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929)

Closes 11/20/2026Opened 10/21/2026

State of Michigan·Michigan

65% match

171/23125.CTS; Jerome Hart Building - Chilled Water Upgrades

Closes 11/11/2026Opened 10/23/2026

Town of Eatonville·Florida

64% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Philadelphia·Pennsylvania

64% match

OEM Water

Closes 11/30/2026Opened 5/29/2026

City of Ontario·California

64% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Connecticut City of New Britain·Connecticut

64% match

27-009 Willow Brook Park Pool Filter Replacement

Closes 11/24/2026Opened 10/30/2026

City of Ontario·California

63% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

New York City Department of Design and Construction·New York

63% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 6/17/2016

Sussex County·Delaware

63% match

Water Source Heat Pump Replacement

Closes 11/9/2026Opened 10/16/2026

Dedham Housing Authority·Massachusetts

63% match

Main Isolation Valves, Bathroom Sinks, Faucets and Water Shutoffs

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Maryland

63% match

NSWCCD York Chill Pump Replacement

Closes 11/16/2026Opened 10/26/2026

New York State Energy Research and Development Authority·New York

63% match

Window Heat Pump Demonstration Program - Phase I

Closes 6/30/2027Opened 11/14/2025

New York City Department of Design and Construction·New York

63% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

Department of Buildings & General Services·Vermont

63% match

Kettle Pond State Park Drinking Water System

Closes 11/4/2026Opened 10/7/2026

Austin Energy (City of Austin)·Texas

63% match

2026 IDIQ Chilled Water Construction In The ROW Reissue

Rolling / TBD closeOpened 8/31/2026

U.S. Department Of Defense·Connecticut

62% match

Construction of Chilled Water Plant and Site Utility Upgrades at VA Medical Center in West Haven, CT

Closes 11/20/2026Opened 9/30/2026

New York City Department of Design and Construction·New York

62% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 4/27/2026

Massachusetts City of Taunton·Massachusetts

62% match

Water Chemicals for Taunton

Closes 11/17/2026Opened 10/21/2026

New York City Department of Design and Construction·New York

62% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

Virginia Community College System - System Office·Virginia

62% match

ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)

Closes 11/19/2026Opened 10/6/2026

California Department of General Services·California

62% match

Bottled Drinking Water

Closes 11/9/2026Opened 9/29/2026

City of DeLand·Florida

62% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Connecticut Metropolitan District Commission·Connecticut

62% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

New York City Department of Design and Construction·New York

62% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025