Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›2026 Southfield Road Water Main (Contract WM 2026-01)

Michigan City of Lathrup Village·Michigan

2026 Southfield Road Water Main (Contract WM 2026-01)

Closes 11/25/2025$1.5M – $3MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Lathrup Village is seeking bids for the installation of a new water main along Southfield Road. The project includes the installation of 2,400 feet of water main, gate valves, fire hydrants, and domestic water services. The contractor will also be responsible for sidewalk and ADA ramp replacement, pavement replacement, and lawn restoration. The project must be completed in accordance with the Michigan Department of Transportation's 2020 Standard Specifications for Construction and supplemental specifications. • The water main will be installed within the public right-of-way of Southfield Road, from Lincoln Drive to W Eleven Mile Road. • The contractor must verify the location of all existing water services and connections before disconnection from the existing water main. • The contractor must provide all materials necessary to connect to existing water services, regardless of the existing size or material of the service. • The project requires the installation of temporary soil erosion and sedimentation control measures, which must be maintained weekly and after every storm event. • The contractor must comply with all federal, state, and local codes for noise levels, vibrations, or any other restrictions during construction. • The project has a number of technical requirements, including the use of specific materials and equipment, such as ductile iron pipe, gate valves, and fire hydrants. • The contractor must ensure that all work is done in accordance with the plans and specifications, and that all necessary permits and approvals are obtained before commencing work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joe Kolpasky(Engineer)

[email protected]

(248) 598-5171

Key dates

Opened
10/28/2025
Questions due
11/13/2025
Closes
11/25/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
16496.54

Budget estimate

$1,500,000 – $3,000,000

Based on the project description, the estimated budget for this project is between $1,500,000 and $3,000,000. This estimate is based on the scope of work, which includes the installation of 2,400 feet of water main, gate valves, fire hydrants, and domestic water services, as well as sidewalk and ADA ramp replacement, pavement replacement, and lawn restoration. The estimate also takes into account the need for temporary soil erosion and sedimentation control measures and the requirement for compliance with Michigan Department of Transportation standards.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 75%

Fiscal Year 2026 Street Main Extensions Contract 1

Rolling / TBD closeOpened 1/15/2026

City of Charlotte·North Carolina

73% match

Fiscal Year 2026 Street Main Extensions Contract 2

Rolling / TBD closeOpened 1/15/2026

City of Bellevue·Washington

73% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Charlotte·North Carolina

72% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Massachusetts Town of Westborough·Massachusetts

72% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Massachusetts Town of Plymouth·Massachusetts

72% match

22620 Sandwich Road Water Main Replacement

Closes 11/5/2026Opened 10/15/2026

Village of Wilmette·Illinois

72% match

2027 Water Main Replacement Construction Engineering Services

Closes 11/4/2026Opened 10/15/2026

Goodwyn Mills Cawood·Georgia

72% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Butler County·Ohio

72% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

City of Riverside·California

71% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

71% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Catawba Regional Council of Governments·South Carolina

71% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

Hastings Utilities·Nebraska

70% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Oregon Tualatin Valley Water District·Oregon

70% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Augusta, GA (Augusta Commission)·Georgia

70% match

Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026

Florida Governmental Utility Authority·Florida

70% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

City of DeLand·Florida

70% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Northern Kentucky Water District·Kentucky

70% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

Clermont County - Board of Commissioners·Ohio

70% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

Western Virginia Water Authority·Virginia

70% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Rogers Water Utilities·Arkansas

70% match

General Contractor / Construction Manager for Rogers Water Utilities Field Operations Facility

Closes 11/16/2026Opened 10/25/2026

Massachusetts Town of Middleborough·Massachusetts

70% match

South Wells Water Treatment Facility, DWSRF# 19217, Contract ENG25-0918-Sub Prequal

Closes 11/13/2026Opened 10/14/2026

City of McCook·Nebraska

70% match

South 3rd Street Water System Improvements

Closes 11/10/2026Opened 10/21/2026

City of Ontario·California

69% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Georgia City of Augusta·Georgia

69% match

26-280 Cook Road Waterline Replacement

Closes 11/30/2026Opened 10/29/2026