The Reno‑Tahoe Airport Authority (RTAA) is seeking a qualified, Nevada‑licensed contractor to replace the roof on the Airfield Maintenance Storage Building at Reno‑Tahoe International Airport. The work includes removal of the existing ballast roof system, installation of a fully‑adhered single‑ply roofing membrane, replacement of parapet caps, tapered insulation where needed, and safety railing at the upper roof hatch. All materials, labor, tools, transportation, permits, utilities, and incidental items are required to be provided by the contractor. The engineer’s cost estimate is $225,000‑$325,000 and funding is from RTAA’s general fund. Bids must be submitted in hard copy and electronic flash‑drive format by 2:00 PM PT on August 26, 2026. A non‑mandatory pre‑bid meeting (August 11) and optional site walk (August 17) are offered.
• Scope: full roof removal, new single‑ply membrane installation, parapet & insulation work, safety railing.
• Location: Airfield Maintenance Storage Building, Reno‑Tahoe International Airport, Reno, NV.
• Budget: $225‑$325 k (engineer estimate); contractor’s price may vary within this range.
• Schedule: Bid opening 2:00 PM PT Aug 26, 2026 (Zoom); contract award date not stated.
• Submission: One original hard‑copy bid + electronic copy on flash drive; sealed envelope marked “ITB #26/27‑06 Roof Replacement…”.
• Contacts: Katelyn Duggan, Senior Buyer, (775) 328‑6673,
[email protected].