Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More agriculture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Hazard Tree Removal Rogue Rive Siskiyou, Oregon

U.S. Department Of Agriculture·Oregon

Hazard Tree Removal Rogue Rive Siskiyou, Oregon

Closes 7/24/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Department of Agriculture (USDA) is seeking a contractor to provide hazardous tree removal and fuels management services throughout the Slater Fire and Wild Rivers Road system on the Rogue River Siskiyou (RRS) National Forest, Oregon, with some performance located in Siskiyou County, California. The objective of these treatments is to reduce fuels hazards, improve forest health, and better achieve the potential yield capability of these sites by removing undesirable/hazardous trees and retaining dominant and codominant trees of the best quality. • The contractor will be responsible for performing hazardous tree removal, felling, stacking, pruning, and slash treatment along 92 miles of road with additional optional items 49 miles of FS roads. • The contractor will also be required to provide a Quality Assurance Surveillance Plan (QASP) and adhere to all Occupational Safety and Health Administration (OSHA) regulations. • The government expects the contractor to work at an acceptable performance level throughout the life of the contract, and the contractor’s performance will be rated in COR reports and in the Contractor Performance Assessment Reporting System (CPARS).

Attached files

Contact

Raymond Padgett III

[email protected]

Key dates

Opened
6/25/2026
Closes
7/24/2026
Duration
1825 days

Last updated

Details

Type
Request for Proposal
Industry
Agriculture
NAICS
115310
Solicitation №
1240BF26Q0035

Budget estimate

$500,000 – $2,000,000

The budget for this contract is not explicitly stated in the document. However, based on the scope of work, which includes hazardous tree removal and fuels management services for 92 miles of road, the estimated budget could be in the range of $500,000 to $2,000,000. This estimation is based on the assumption that the cost per mile of road would be between $5,000 and $20,000, considering the complexity of the work and the need for specialized equipment and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washington County, Oregon·Oregon

Top match · 70%

Early Tree Removal for Capital Project Services

Closes 11/6/2026Opened 10/26/2026

Oregon Department of Transportation·Oregon

68% match

ESB 2026 US101: MP250-MP252.7 Tree & Vegetation Removal Project

Closes 11/12/2026Opened 10/29/2026

Oregon Department of Fish and Wildlife·Oregon

68% match

Whaleback and Huckleberry Meadow Enhancement 2026-27 Slash/Pile Project

Closes 11/2/2026Opened 10/13/2026

Oregon Department of Fish and Wildlife·Oregon

68% match

HIGH DESERT SAGE STEPPE HABITAT RESTORATION

Closes 11/25/2026Opened 10/26/2026

Escambia County·Florida

67% match

CRA Hazardous Tree Removal at 10 Commander Dr.

Closes 11/13/2026Opened 10/28/2026

Town of Norwich·Vermont

66% match

Town of Norwich - Roadside Hazardous Tree Removal Project

Closes 11/23/2026Opened 10/26/2026

Escambia County·Florida

66% match

CRA Hazardous Tree Removal at 203 Frisco Rd

Closes 11/13/2026Opened 10/28/2026

Oregon Department of Fish and Wildlife·Oregon

66% match

Large Wood Harvest Staging - Anthony Creek Uplift

Closes 11/16/2026Opened 10/21/2026

East Bay Municipal Utility District·California

65% match

Local Watershed Tree Planting Maintenance and Monitoring

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Agriculture·Oregon

65% match

Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

Closes 11/16/2026Opened 10/1/2026

SC Forestry Commission·South Carolina

65% match

Red Cockaded Woodpecker Raking

Closes 11/4/2026Opened 10/13/2026

Merrimack County·New Hampshire

65% match

RFP20261030 Tree Removal Services

Rolling / TBD closeOpened 10/30/2026

Arkansas

65% match

NW Park Tree Replacement

Rolling / TBD closeOpened 8/30/2026

El Dorado Irrigation District·California

65% match

Sly Park Intertie Improvements - Habitat Mitigation and Monitoring Plan Implementation

Closes 11/12/2026Opened 10/16/2026

Escambia County·Florida

65% match

CRA Hazardous Tree Removal at 7069 Cabral St.

Closes 11/13/2026Opened 10/28/2026

Escambia County·Florida

65% match

CRA Hazardous Tree Removal at 3020 Michael Dr.

Closes 11/13/2026Opened 10/28/2026

County of Riverside·California

65% match

Tree Maintenance and Tree Pest Management Services

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Agriculture·District of Columbia

64% match

Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon

Closes 11/16/2026Opened 10/1/2026

Escambia County·Florida

64% match

CRA Hazardous Tree Removal at 3005 N. Hayne St.

Closes 11/13/2026Opened 10/28/2026

Oregon Wasco County Soil & Water Conservation District·Oregon

64% match

Contractor pool for fuels reduction and habitat restoration

Closes 11/30/2026Opened 10/28/2026

Connecticut Town of Westport·Connecticut

64% match

Tree Removal and Emergency Tree Maintenance

Closes 11/20/2026Opened 10/28/2026

Oregon Marion County·Oregon

64% match

ITB - Construction of the Timber Trail Guardrail

Closes 11/3/2026Opened 10/12/2026

Massachusetts Department of Transportation·Massachusetts

64% match

616509 DISTRICT 6 Scheduled & Emergency Tree Trimming & Sight Distance Improvement at Various Loca

Closes 11/3/2026Opened 10/5/2026

Confederated Tribes of the Colville Reservation·Washington

64% match

San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027

Closes 11/17/2026Opened 10/28/2026

DuPage County - Procurement Services·Illinois

64% match

TREE REMOVAL 26-096-SWM

Closes 11/10/2026Opened 10/22/2026