Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›VINA SUBBASIN MONITORING WELL PROJECT

Vina Groundwater Sustainability Agency·California

VINA SUBBASIN MONITORING WELL PROJECT

Closes 1/8/2026$400k – $500kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Vina Groundwater Sustainability Agency is seeking bids from qualified well drillers to install groundwater monitoring wells. The project includes the drilling and construction of up to 1 multi-completion monitoring well and up to 8 shallow dual-completion monitoring wells, along with all related items of work. The project is expected to be completed within 120 calendar days from the date established in the Notice to Proceed. The Engineer's estimate for this project is $453,000. Key aspects of the project include: * Mobilization, encroachment, and well permitting * Test hole drilling with sample collection * Installation of well casings and screens * Installation of gravel envelopes and intermediate seals * Well development * Surface completion * All related items of work at each of the specified locations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Autum Thomas(Bid Contact)

[email protected]

(530) 552-3595

Key dates

Opened
1/6/2026
Closes
1/8/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110
Solicitation №
Vina-2026-01

Budget estimate

$400,000 – $500,000

Based on the Engineer's estimate, the project is expected to cost around $453,000. This amount is likely to be the total budget for the project, assuming all work is completed as specified. The budget may be influenced by factors such as the complexity of the drilling and construction work, the location of the project, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Maui·Hawaii

Top match · 64%

Groundwater Deep Monitoring Well at Alaeloa Tank Site [Tk104]

Closes 11/13/2026Opened 10/5/2026

U.S. Department Of The Interior·Colorado

61% match

INJECTION WELL FAILURE MODE EVALUATION

Closes 11/10/2026Opened 10/13/2026

U.S. Department Of Defense·New Hampshire

61% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·Washington

61% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

Ohio Department of Natural Resources·Ohio

60% match

Water Well Database Production Support

Closes 12/1/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·New Hampshire

60% match

F108--Groundwater Remediation

Closes 11/12/2026Opened 10/27/2026

City of Troy, OH·Ohio

60% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

Chittenden County Regional Planning Commission·Vermont

60% match

Ongoing Call: Water Quality Improvement Project Subcontractors

Closes 12/31/2026Opened 12/19/2023

City of Santa Rosa·California

60% match

Bennett Valley Golf Course Irrigation System Improvements

Closes 11/5/2026Opened 10/6/2026

Irvine Ranch Water District·California

60% match

Wells 6, 12, 14, and 15 Site Improvements

Closes 11/18/2026Opened 10/15/2026

State of Wyoming·Wyoming

60% match

Pinedale Gaseous Ambient Air Monitoring Project

Closes 11/9/2026Opened 9/14/2026

Massachusetts Town of Pembroke·Massachusetts

60% match

Pembroke Well 4R Implementation

Closes 11/18/2026Opened 10/27/2026

Florida Department of Corrections (FDC)·Florida

60% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

U.S. Department Of Agriculture·District of Columbia

60% match

Intermountain Stewardship BPA

Closes 12/31/2026Opened 3/2/2023

East Bay Municipal Utility District·California

60% match

Local Watershed Tree Planting Maintenance and Monitoring

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

59% match

Arcadia Wet Well Rehabilitation

Closes 11/9/2026Opened 10/8/2026

Massachusetts Town of Middleborough·Massachusetts

59% match

South Wells Water Treatment Facility, DWSRF# 19217, Contract ENG25-0918-Sub Prequal

Closes 11/13/2026Opened 10/14/2026

City of Sacramento·California

59% match

Municipal Groundwater Well Drilling Contractors

Closes 11/19/2026Opened 10/29/2026

Colorado Department of Public Health and Environment (CDPHE)·Colorado

59% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/22/2026

U.S. Department Of Defense·Kansas

59% match

Fort Leavenworth Underground Fuel Tank Testing and Repair Services

Closes 11/6/2026Opened 10/7/2026

Colorado Department of Public Health and Environment·Colorado

59% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/23/2026

Nevada Department of Human Services·Nevada

59% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

Colorado Department of Public Health and Environment (CDPHE)·Colorado

59% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/30/2026

West Virginia Department of Environmental Protection·West Virginia

59% match

Pleasants - Ritchie Group A Well Plugging Package

Closes 12/1/2026Opened 10/27/2026

U.S. Department Of Defense·California

59% match

Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)

Closes 11/30/2026Opened 10/28/2026