Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Fort Thompson Intake/Pumphouse Construction

U.S. Department Of Defense·Nebraska

Fort Thompson Intake/Pumphouse Construction

Closes 5/8/2026$5M – $10MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers (USACE) Omaha District is issuing an Invitation for Bid (IFB) for the construction of a new intake/pumphouse at Fort Thompson, South Dakota. The project involves constructing a wet well, water intake, and pump house at Lake Sharpe, Fort Thompson, SD, in accordance with the incorporated specifications and drawing sheets. The IFB will result in one Firm Fixed-Price contract for installing a new raw water intake system and constructing a new pump house on Lake Sharpe at Fort Thompson in South Dakota. Key aspects of the project include: * Constructing a wet well, water intake, and pump house * Installing a new raw water intake system * Building a new pump house on Lake Sharpe at Fort Thompson * Ensuring the pump system meets the specified design requirements and capacities * Providing a warranty for all equipment included under this section against defective workmanship, materials, design, and performance for a period of 2 years from the date the equipment is accepted. Some of the key requirements for the project include: * The pump system must be designed and constructed for a heavy-duty application with a minimum 25-year design life * The pump must be engineered and constructed to pump lake water from the wet well into the Ultrafiltration Treatment Plant * The pump system must meet the specified capacities and head requirements * The contractor must provide a certified test report stating the specified pumps meet HI ANSI/HI 14.6 after testing is complete.

Attached files

Contact

Sam McGuffey(Primary Contact)

[email protected]

(402) 995-2077

Key dates

Opened
12/16/2025
Pre-bid meeting
2/10/2026
Site visit
2/10/2026
Closes
5/8/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
W9128F26BA018

Budget estimate

$5,000,000 – $10,000,000

Based on the project description, the estimated magnitude of construction is between $5,000,000 and $10,000,000. This estimate is likely based on the scope of work, which includes the construction of a wet well, water intake, and pump house, as well as the installation of a new raw water intake system. The complexity of the project, the materials required, and the labor involved also support this estimate. Factors that may influence the likely payment range include: * The cost of materials, such as steel, concrete, and piping * The cost of labor, including the cost of skilled workers, such as engineers, electricians, and plumbers * The cost of equipment, such as pumps, motors, and control systems * The cost of permits, inspections, and testing * The cost of contingencies, such as unexpected site conditions or changes to the scope of work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.P. Engineers & Architects, Inc·Michigan

Top match · 67%

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Alaska Native Tribal Health Consortium (ANTHC)·Alaska

65% match

Selected Construction Opportunities

Closes 1/1/2036Opened 12/7/2023

Northern Kentucky Water District·Kentucky

65% match

Roof Replacement for Fort Thomas Treatment Plant Chemical Building

Closes 12/4/2026Opened 10/30/2026

Gwinnett County Government·Georgia

65% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Connecticut Town of South Windsor·Connecticut

64% match

Clark Street Pump Station Main Replacement Project

Closes 11/4/2026Opened 10/6/2026

Massachusetts Auburn Water District Inactive·Massachusetts

64% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

Rural Community Water District of Georgetown County·South Carolina

64% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Chennault International Airport Authority·Louisiana

64% match

Firewater Pumphouse #2 (FWPH) Firewater Storage Tanks 1 & 2 Repairs, Recoat, and Controls Upgrade (Project #2026-03)

Closes 11/17/2026Opened 10/13/2026

Massachusetts Town of Nantucket·Massachusetts

64% match

IFB - Well No. 17 Pump Station Project

Closes 12/9/2026Opened 10/28/2026

City of Fresno·California

64% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

City of Dunedin·Florida

63% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

63% match

Shower Building Addition NYS Park Police Training Academy

Closes 11/5/2026Opened 9/30/2026

City of Stillwater·Oklahoma

63% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

U.S. Department Of Health And Human Services·South Dakota

63% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

City of Hickman, Nebraska·Nebraska

63% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

Barnet Fire District No. 2·Vermont

63% match

Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation

Closes 12/3/2026Opened 10/28/2026

City of Eureka Springs·Arkansas

63% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

Oregon Parks and Recreation Department·Oregon

62% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

City of Hilliard, Ohio·Ohio

62% match

Heritage Lakes No 1 Lift Station Replacement (CIP S-48)

Closes 11/19/2026Opened 10/29/2026

Tacoma·Washington

62% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 10/2/2026

Tacoma·Washington

62% match

Trilogy Reservoir and Booster Pump Station

Closes 11/10/2026Opened 9/30/2026

Upper Occoquan Service Authority·Virginia

62% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

U.S. Department Of Defense·Nebraska

62% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

City of Charlotte·North Carolina

62% match

Construction Administration & Inspection Miscellaneous Services

Rolling / TBD closeOpened 4/30/2026