The City of Columbia is seeking a contractor to perform sidewalk and stormwater improvements along Curtis Avenue. The project includes the removal and replacement of pavement surfaces, base course, curb, curb and gutter, sidewalks, house walks, steps, sign and signal bases, retaining walls, foundation walls, drainage structures, manholes, abandoned sewers, drainage pipes and pipe lines of all types, and other objects or improvements within the grading limit that are not designed to remain in place as specified. The contractor shall provide materials and equipment that meet or exceed the requirements specified in the project plan sheets, technical specifications, and other documents. The contractor shall also comply with all applicable laws, ordinances, and regulations, including those related to prevailing wages, occupational safety and health, and environmental protection.
• The project requires the contractor to complete all work within 45 calendar days from the date of Notice to Proceed.
• The contractor shall provide a bid bond in an amount not less than 5% of the offeror's proposal.
• The contractor shall comply with all requirements of the prevailing wage law of Missouri.
• The contractor shall provide a performance bond and a labor and material payment bond, each with a corporate surety satisfactory to the purchasing agent, in an amount not less than the contract price.
• The contractor shall assume responsibility for all loss or damage to materials and equipment for the contracted project.