The U.S. Consulate General São Paulo is seeking a specialized and certified company to perform the replacement of valves that compose the chilled water system located at the São Paulo Compound site. The work requirements are described in the scope of work. The project is divided into three phases: kickoff meeting and walkthrough, valves replacement, and project closeout. The contractor will be responsible for providing all labor, equipment, materials, tools, transportation, and supervision necessary to complete the work. The project must be completed within 10 business days from the date of Notice to Proceed.
• The contractor will replace the chilled water control valves in three Air Handling Units (AHUs) and the main chilled water control valve in the chiller loop.
• The contractor will install two ultrasonic flow sensors in the chilled water piping system.
• The contractor will provide all necessary modifications to the piping system, including the addition of flanges.
• The contractor will follow all applicable standards and regulations during the execution of the valve replacement.
• The contractor will submit a work schedule for COR review and approval prior to commencing work at the site.
• The contractor will maintain quality control over suppliers, manufacturers, products, services, site conditions, and workmanship to produce work of specified quality.