The City of Crescent City is seeking a qualified General Engineering Contractor to execute Phase 1B of the Beachfront Park redevelopment. The contract covers complete site preparation, demolition, earthwork, utility installation, paving, storm‑drain and sanitary‑sewer work, electrical distribution, playground and amenity installation, landscaping, irrigation, and final site finish for a 35‑acre waterfront park. Work must comply with a conditional Coastal Development Permit, a city‑provided SWPPP, and California prevailing‑wage requirements. The bid consists of 87 line‑item items; the award will be based on the lowest total base bid.
• Demolition of existing concrete/asphalt, grading, and import of fill for berms and amphitheater.
• Installation of HDPE storm‑drain pipes, new water and sewer laterals, and electrical infrastructure including lighted bollards and food‑truck pedestals.
• Construction of inclusive playground, amphitheater stage, waterfront plaza, parking‑lot resurfacing, and extensive native‑plant landscaping with irrigation.
• All work must meet coastal permit conditions, SWPPP BMPs, and state labor‑law prevailing‑wage rules.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.