Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›Triple 65 LF – 66” Aluminum Pipe with Headwalls - Ash…

North Carolina Department of Transportation·North Carolina

Triple 65 LF – 66” Aluminum Pipe with Headwalls - Ash Little River Road - SR1300 Pipe Replacement

Closes 8/3/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The North Carolina Department of Transportation is seeking bids for the provision of a triple-barrel aluminum pipe culvert system, including headwalls, wing walls, welding requirements, flanged joints, geogrid stabilization material, and on-site technical support. The project is located in Brunswick County and requires the delivery and assembly of the pipe system within 30 consecutive calendar days after receipt of the purchase order. The vendor must provide all necessary hardware, wale beams, caps, continuous flat gaskets, galvanized steel tieback rods with dead man anchor plates, anchors, lugs, inserts, adjustable turnbuckles, and other materials necessary to complete the project. • The pipe system must meet or exceed the listed specifications and be designed and fabricated to meet AASHTO material requirements for Aluminum Box Culvert with Aluminum Structural Plate Headwalls. • The vendor must provide a detailed drawing, stamp, and wall calculations provided by an independent engineering firm within five consecutive calendar days after the award. • The vendor must submit a safety bracing plan to eliminate the tipping or falling of the headwall during assembly. • The vendor must provide at least three references for which the company has provided substantially similar items as those offered in the bid response.

Attached files

Contact

Jason James(Procurement Specialist III)

[email protected]

(919) 707-2617

Key dates

Opened
7/20/2026
Questions due
7/23/2026
Closes
8/3/2026
Duration
30 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
54-JJ-PR37020

Budget estimate

$200,000 – $500,000

The budget for this project is estimated to be between $200,000 and $500,000, based on the complexity of the project and the materials required. The project involves the delivery and assembly of a triple-barrel aluminum pipe culvert system, including headwalls, wing walls, and other materials, which suggests a significant investment of resources and labor. However, without more specific information about the project's scope and requirements, it is difficult to provide a more precise estimate. Factors that may influence the likely payment range include the vendor's experience and reputation, the quality of the materials and workmanship, and the level of competition for the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Eastern Municipal Water District·California

Top match · 71%

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

City of Redlands·California

70% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Oregon Tualatin Valley Water District·Oregon

70% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

Western Virginia Water Authority·Virginia

70% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of Salina·Kansas

70% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Riverside·California

69% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Goodwyn Mills Cawood·Georgia

69% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

U.S. Department Of Defense·United States of America

69% match

47--ELBOW,PIPE

Closes 11/1/2026Opened 10/22/2026

City of Anderson, SC·South Carolina

69% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026

City of Ontario·California

69% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Shawnee·Kansas

69% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Louisiana St. Tammany Parish Government·Louisiana

69% match

Peg Keller Rd Drainage

Closes 11/5/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

69% match

45--PIPE,AIR CONDITIONING-

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·New Hampshire

69% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

69% match

47--PIPE,METALLIC

Closes 11/8/2026Opened 10/29/2026

Gwinnett County Government·Georgia

69% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/22/2026

Georgia Gwinnett County·Georgia

69% match

BL131-26, Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

City of Charlotte·North Carolina

69% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

City of Salina·Kansas

69% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Beaumont·California

68% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026