Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›DAF WTP Pump VFD Replacement

City of Waco·Texas

DAF WTP Pump VFD Replacement

Closes 10/31/2025$200k – $500kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Waco is seeking bids for the replacement of the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD. The project includes the furnishing of all labor, materials, equipment, appurtenances, and incidentals required for demolition, removal, and disposal work to properly install the equipment and ensure all instrument and control connections are correctly configured. The project requires all site work, labor, equipment, and materials to be complete and in place as stated in the RFB, shown on the plans, and specified herein. Key features of the project include: * Replacement of the existing VFD with a new one that meets the specifications outlined in the RFB * Installation of all necessary components to deliver a fully integrated and operational system * Compliance with the 2023 National Electric Code and City of Waco Permitting and Inspection requirements * Performance of functioning testing before commissioning the VFD * Completion of all site work, labor, equipment, and materials within 285 calendar days * Substantial completion and in-service within 255 calendar days * General Contractor to self-perform a minimum of 51% of the project * Liquidation fee of $1000.00 for each day of delay

Attached files

Contact

Kasey Gamblin(Purchasing Manager)

[email protected]

(254) 750-8405

Key dates

Opened
9/15/2025
Questions due
10/6/2025
Pre-bid meeting
9/29/2025Mandatory
Closes
10/31/2025
Duration
285 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2025-067

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work and industry standards. Considering the replacement of a pump and related equipment at a water treatment plant, the cost could range from $200,000 to $500,000. This estimate takes into account the cost of materials, labor, and equipment required for the project. Factors that may influence the budget include the complexity of the project, the experience of the contractor, and the availability of materials and labor.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Toledo·Ohio

Top match · 65%

Safety Building HVAC Pumps and VFD Replacement

Closes 11/10/2026Opened 10/23/2026

Department of Corrections·South Carolina

63% match

WME CHILLER Drive Repair

Closes 7/31/2027Opened 7/24/2026

North Carolina City of Raleigh·North Carolina

63% match

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

Metropolitan Council·Minnesota

62% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

City of Worcester·Massachusetts

61% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

U.S. Department Of Veterans Affairs·New York

60% match

Y1DZ--REPLACE CHILLED WATER PUMP AT THE BOILER PLANT

Closes 11/11/2026Opened 10/29/2026

U.S. Department Of Defense·Pennsylvania

60% match

59--VFD FRAME SUB-ASSY, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 9/23/2026

U.S. Department Of Defense·Ohio

60% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

60% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/8/2026Opened 9/24/2026

City of Branson·Missouri

60% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

60% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

60% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

U.S. Department Of Veterans Affairs·North Dakota

59% match

F109--Underground Diesel Storage Tank Boot Replacement , Fargo VA Healthcare System.

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Defense·Pennsylvania

59% match

59--VFD FRAME SUB-ASSY, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 9/19/2026

City of Appleton·Wisconsin

59% match

WTP BOILER REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

59% match

PUMP,RECIPROCATING

Closes 11/2/2026Opened 10/27/2026

Oregon DAS On-Behalf Of·Oregon

59% match

VRF Cooling System Replacement

Closes 11/3/2026Opened 10/2/2026

St. Bernard Parish Government·Louisiana

59% match

Grundfos SLV Pumps or Equal St. Bernard Parish Government Department of Public Works Water and Sewer Division

Closes 11/17/2026Opened 10/29/2026

Department of Water·Hawaii

59% match

IFB Job No. 27-03, Koloa Well F Pump Replacement, Kauai, Hawaii

Closes 11/12/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

59% match

PUMP UNIT,CTFGL

Closes 11/2/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

58% match

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

58% match

PUMP UNIT,ROTARY

Closes 11/5/2026Opened 10/6/2026

Texas Tx Dept Crim. Justice/inst Div·Texas

58% match

Water Pumps

Closes 11/6/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

58% match

PUMP,RECRIPROCATING

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·Massachusetts

58% match

Hanscom Aero Club Automated Fuel Management System Replacement

Closes 11/6/2026Opened 10/16/2026