The State of Michigan is seeking a contractor to perform HVAC upgrades at the Parnall Correctional Facility. The project includes upgrades to the heating and ventilation systems in multiple buildings. The contractor will be required to follow the State's standard construction contract forms and conditions, as well as the Michigan Department of Corrections' (MDOC) technology and installation standards. The contractor must ensure that all work and materials meet the requirements of the National Fire Protection Association, the local Electrical Code, and present manufacturing standards.
• The contractor must submit an hour-by-hour schedule two weeks prior to construction.
• The contractor must comply with the MDOC's standards for electrical, ethernet, fiber, and IP installations.
• The contractor must use approved manufacturers for Cat 6 copper horizontal distribution cables, termination equipment, video security management software, access control software, and Ethernet switches.
• The contractor must follow the color codes specified for cable and jack color.
• The contractor must ensure that all installations meet the NEC 2017 code book and follow the guidelines for NFPA 70.