Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Mexico guideNew Mexico Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Mexico
  4. ›Civil Engineering
  5. ›I‑40 Mile‑Post 30.5‑32.2 Bridge Replacement & Associated…

New Mexico Department of Transportation·New Mexico

I‑40 Mile‑Post 30.5‑32.2 Bridge Replacement & Associated Design Services (Phase IA/IB/IC/ID & Phase II)

Closes 5/19/2026$2M – $5MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for a professional‑services contract to design, study, and engineer the replacement of Bridge No. 6523 on I‑40 (mile‑post 30.5‑32.2) in McKinley County, including related drainage improvements, NM 118 elevation, and environmental compliance. The work is divided into multiple phases (IA‑ID and Phase II) and will be performed over a four‑year fixed‑price term under federal funding. The contractor must provide bridge type selection, hydrologic/hydraulic modeling, preliminary and final design drawings, geotechnical reports, and coordination with NMDOT, BNSF, and federal agencies. The solicitation requires extensive documentation (acknowledgement of receipt, health‑coverage forms, DBE compliance, etc.) and mandates submission via the electronic Bid Express system. • Deliver a Bridge Type Selection Report, hydraulic model, and cost estimates (Phase IA/IB). • Complete environmental NEPA documentation, geotechnical investigations, and preliminary design packages (Phase IC/ID). • Produce final design, construction‑ready plans, and PS&E documents (Phase II). • Provide optional construction‑phase engineering support if later required.

Attached files

Contact

Consuelo Nevarez(Procurement Manager)

[email protected]

(505) 487-0271

Key dates

Opened
4/17/2026
Questions due
5/6/2026
Closes
5/19/2026
Projected award
10/1/2026
Duration
4 years

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
RFP No. 27-01

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed in the solicitation. Typical federal‑funded bridge design contracts of comparable scope (2‑mile corridor, multi‑phase, four‑year term) range from $2 million to $5 million in total fees. The estimate assumes a mid‑range hourly rate for senior engineers (~$150–$200/hr) and the required staff levels for design, environmental, and project management activities over 4 years.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Arkansas

Top match · 72%

bids - replace I-55 bridge

Rolling / TBD closeOpened 10/11/2026

Illinois THA - Toll Highway Authority·Illinois

71% match

Change Order Notice I-25-2005 RM Tollway (I-88), Bridge Recon at CNR, Phase II Engineering Services

Closes 11/19/2026Opened 10/20/2026

City of Meriden·Connecticut

71% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

Connecticut City of Meriden·Connecticut

71% match

Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

NYS Niagara County·New York

71% match

PIN 5765.39: D041682, Replacement of CR 55 Royalton Center Road Bridge (BIN 3360080) over Mud Creek in the Town of Royalton, Niagara County

Closes 11/5/2026Opened 9/24/2026

Georgia City of Atlanta·Georgia

70% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Benewah County·Idaho

70% match

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

City of Atlanta·Georgia

70% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

City of Indianapolis·Indiana

70% match

BM-21-045 46th Street over Indian Creek

Closes 11/19/2026Opened 10/23/2026

Virginia Department of Transportation·Virginia

70% match

B34_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Division of Highways·North Carolina

70% match

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

City of St. Louis·Missouri

70% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Connecticut Town Of Clinton·Connecticut

69% match

Replacement of Bridge No. 06956, Country Village Lane over Unnamed Brook

Closes 11/4/2026Opened 10/9/2026

Massachusetts Department of Transportation·Massachusetts

69% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Town of Pulaski·Virginia

69% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Virginia Department of Transportation·Virginia

69% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 1/13/2027Opened 8/19/2026

California Department of Transportation·California

69% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

Delaware River Joint Toll Bridge Commission·New Jersey

69% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Virginia Department of Transportation·Virginia

69% match

B35_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Connecticut Dept. of Transportation·Connecticut

69% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Massachusetts Department of Transportation·Massachusetts

69% match

607349 NORWELL- PEMBROKE- MARSHFIELD- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER

Closes 11/13/2026Opened 1/30/2026

Texas Department of Transportation·Texas

69% match

STATE LET CONSTRUCTION CONTRACT, BURLESON CO, BRIDGE REPLACEMENT

Closes 11/3/2026Opened 10/7/2026

LA Public Works Engineering Bureau·California

69% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026