Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Civil Engineering
  5. ›McCorkle Creek Detention Structure Phase 2

Cowlitz County·Washington

McCorkle Creek Detention Structure Phase 2

Closes 11/25/2025$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lexington Flood Control Zone District is seeking bids for the McCorkle Creek Detention Structure Phase 2 Modifications project. The project involves raising the existing earthen detention structure, constructing a reinforced concrete spillway, and installing various pipes and structures. The work must be completed within 400 working days. Key aspects of the project include: • Providing all materials and labor for the construction work • Raising the existing earthen detention structure approximately 15-feet • Constructing a 200 foot long by 75 foot wide reinforced concrete spillway • Installing 305 linear feet of 48-inch diameter ductile iron pipe • Installing 1,500 linear feet of gravel access road • Plugging and abandoning 160 linear feet of existing 36-inch storm pipe • Implementing erosion and water pollution control measures • Restoring the site after completion of the work

Attached files

Contact

Patrick Harbison(Diking Engineer)

Key dates

Opened
10/6/2025
Pre-bid meeting
10/28/2025Mandatory
Closes
11/25/2025
Duration
400 working days

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
2926

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work, which involves significant construction and installation activities. Considering the materials and labor required, a rough estimate for the project cost could be between $5 million and $15 million. This range is based on the assumption that the project requires a substantial amount of materials, labor, and equipment, and that the contractor will need to factor in costs such as site preparation, excavation, and construction of the spillway and other structures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Church Point·Louisiana

Top match · 69%

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Colton Municipal Utility District No. 1·Texas

66% match

Mass Grading and Detention Facilities to Serve Colton Detention Pond A Phase 1

Closes 11/10/2026Opened 10/20/2026

Santa Clara Valley Water District·California

65% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

S7 KTR, LLC on behalf of Montgomery County Municipal Utility District No. 201·Texas

65% match

Detention Ponds and Mass Grading to Serve Longleaf Development

Closes 11/12/2026Opened 10/23/2026

Cobb County·Georgia

65% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Katy Springs LLC for the Benefit of Harris County Municipal Utility District No. 495·Texas

63% match

Detention Pond and Offsite Storm Sewer to serve Katy Springs

Closes 11/12/2026Opened 10/13/2026

Tuolumne County·California

63% match

Mechanical Site Prep: Jawbone Creek Item 2

Closes 11/13/2026Opened 10/16/2026

City of Gainesville - Procurement Division·Florida

62% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

San Bernardino County·California

62% match

Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill

Closes 11/12/2026Opened 10/27/2026

Greenville County·South Carolina

62% match

Class 2 Landfill Partial Closure

Closes 11/16/2026Opened 10/23/2026

City of Goose Creek·South Carolina

62% match

Creekside Park Renovations

Closes 11/30/2026Opened 10/30/2026

City of Duarte·California

62% match

Duarte Park Redevelopment: Phase II

Closes 11/23/2026Opened 10/28/2026

County of Okaloosa·Florida

62% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Greenville County·South Carolina

62% match

CLASS 2 LANDFILL PARTIAL CLOSURE

Closes 11/16/2026Opened 10/23/2026

Town of Eatonville·Florida

62% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

DOC - Architecture and Engineering·Virginia

62% match

Beaumont Correctional Center Sprinkler Replacement

Closes 11/18/2026Opened 10/5/2026

Michigan Department of Technology, Management and Budget – State Facilities Administration·Michigan

62% match

472/23129.KMM; Woodland C.F. - Site Mechanical Underground

Closes 11/18/2026Opened 10/12/2026

Georgia Cobb County Department of Transportation·Georgia

62% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

U.S. Department Of Defense·Missouri

61% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

Lucas County, OH Facility Management·Ohio

61% match

CIP 26-012 Jail Subsurface Water Remediation – Basement Water Remediation at Lucas County Correction Center

Closes 11/12/2026Opened 10/13/2026

North Carolina City of Raleigh·North Carolina

61% match

John Chavis Memorial Park – Phase 2 Aquatic Center

Closes 11/10/2026Opened 10/28/2026

Michigan Department of Technology, Management and Budget – State Facilities Administration·Michigan

61% match

472/23129.KMM; Woodland C.F. - Site Mechanical Underground

Closes 11/18/2026Opened 10/19/2026

Erie County·New York

61% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

Hegar Springs, LLC for the Benefit of Waller County Municipal Utility District No. 73·Texas

61% match

Water, Sanitary Sewer, Drainage Facilities, Clearing & Grubbing and Mass Grading & Detention Ponds to Serve Solmere Tract Phase 1 and Hegar Springs Parkway

Closes 11/5/2026Opened 9/16/2026

Alabama State Port Authority·Alabama

61% match

RFQ/RFP-Upper Mobile Bay Beneficial Use Wetland Creation (Implementation) – Phase 1

Closes 11/6/2026Opened 9/22/2026