The Town of Parker is seeking bids for the rehabilitation of the Twenty Mile Road Over Sulphur Gulch Bridge. The project includes repairs to the existing bridge, such as structural concrete removal and replacement, concrete flatwork, bridge railing stone veneer removal and reset, pedestrian rail removal and reset, SMA pavement, excavation, backfill, pavement markings, traffic control, and erosion control. The contractor will be responsible for furnishing all materials, labor, tools, equipment, and services necessary for the proper execution of the work. The project is expected to be completed by October 30, 2026.
• The project includes repairs to the existing bridge, such as structural concrete removal and replacement, concrete flatwork, bridge railing stone veneer removal and reset, pedestrian rail removal and reset, SMA pavement, excavation, backfill, pavement markings, traffic control, and erosion control.
• The contractor will be responsible for furnishing all materials, labor, tools, equipment, and services necessary for the proper execution of the work.
• The project is expected to be completed by October 30, 2026.
• The contractor will be required to submit a Traffic Control Plan to the Town of Parker for approval prior to beginning any construction.
• The contractor will be responsible for maintaining access to all roadways, side streets, walkways, driveways, and hike/bike paths at all times unless otherwise directed by the Engineer.