Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Very High Cycle Fatigue and Supplementary High Cycle…

National Aeronautics And Space Administration·Mississippi

Very High Cycle Fatigue and Supplementary High Cycle Fatigue Testing of Additive Alloys

Closes 2/10/2026$500k – $2MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Aeronautics and Space Administration (NASA) is seeking a vendor to perform mechanical testing with an independent laboratory to validate material properties for design. The work includes receiving and inspecting samples, machining and performing mechanical testing, and completing all testing within 18 months. The vendor should have experience testing materials using ultrasonic fatigue (USF) testing at room and elevated temperatures up to 1000°C. The scope of work includes testing of multiple additively manufactured alloys, and the vendor should be able to provide evidence of compatible data. • The vendor shall receive all samples and inspect sample numbers. • The vendor shall track all samples in preparation for machining. • The vendor shall machine and perform mechanical testing of all samples according to a matrix determined by NASA. • The vendor shall complete all machining, mechanical testing (fatigue) within 18 months of receiving all samples at their site. • The vendor shall have experience testing materials using ultrasonic fatigue (USF) testing at room and elevated temperatures up to 1000°C.

Attached files

Contact

Monica D Wilson(Procurement Assistant)

[email protected]

Key dates

Opened
2/5/2026
Closes
2/10/2026
Duration
36 months

Last updated

Details

Type
Sole Source
Industry
Aerospace and Defense
NAICS
611310
Solicitation №
80NSSC26924554Q

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is difficult to estimate because the document does not provide a specific amount. However, based on the scope of work, which includes testing of multiple additively manufactured alloys, and the duration of the project, which is 36 months, the budget could be in the range of $500,000 to $2,000,000. This estimate is based on the assumption that the vendor will need to invest in equipment and personnel to perform the testing, and that the cost of the testing will depend on the number of samples and the complexity of the testing.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Michigan

Top match · 59%

Vendor Qualification Additive Manufacturing Processes

Closes 7/10/2027Opened 7/10/2026

U.S. Department Of Defense·Michigan

58% match

Vendor Qualification Additive Manufacturing Processes

Closes 7/10/2027Opened 7/10/2026

U.S. Department Of Defense·North Dakota

56% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

56% match

Request for Information: Additive Manufacturing

Closes 11/2/2026Opened 10/20/2026

U.S. FAA-COE-JAMS·United States of America

56% match

Joint Center of Excellence for Advanced Materials Research

Closes 1/1/2027Opened 11/1/2023

U.S. Department Of Defense·Oklahoma

56% match

SHIELD,HEAT,AIRCRAF

Closes 11/6/2026Opened 10/7/2026

Kentucky Transportation Cabinet Division of Purchases·Kentucky

55% match

DIELECTRIC & STRUCTURAL TESTING

Closes 11/2/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

55% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/7/2026

U.S. Department Of Energy·Tennessee

55% match

Hach Hardness Analyzer Equipment.

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

55% match

ELECTRONIC MODULE,S

Closes 11/23/2026Opened 10/15/2026

U.S. Department Of Defense·Florida

54% match

Sole Source - COMFRC Procurement Group - Hydrogen Embrittlement Load Frame

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·Oklahoma

54% match

SEAL,METALLIC,AIRCR

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of The Treasury·Texas

54% match

QED Preventative and Remedial Maintenance Service

Closes 11/14/2026Opened 10/30/2026

LA Water & Power·California

54% match

90925 Aboveground Storage Tank Corrosion & Integrity Testing Services

Closes 12/9/2026Opened 10/27/2026

U.S. Department Of Defense·Florida

54% match

Planned Maintenance Interval (PMI) for E-6B

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Transportation·Massachusetts

54% match

Laboratory Capabilities to Test Railroad Tank Car Thermal Protection Systems (TPS)

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·Oklahoma

54% match

SHIELD,HEAT,AIRCRAF

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·Georgia

54% match

Cylinder Assembly (Load Arrestor) PN 1171-3

Closes 11/13/2026Opened 10/13/2026

U.S. Department Of Defense·United States of America

54% match

MOTOR,ALTERNATING C

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·Ohio

54% match

NGC

Closes 11/3/2026Opened 10/19/2026

National Aeronautics And Space Administration·Virginia

53% match

URGENT-BP-1 Lunar Regolith simulant Compressibility Testing

Closes 11/4/2026Opened 10/30/2026

U.S. Department Of Energy·California

53% match

UPDATED ALS SHB pulsed RF HPA

Closes 11/18/2026Opened 10/12/2026

U.S. Department Of Defense·Pennsylvania

53% match

61--MODULE HIGH VOLTAGE

Closes 11/2/2026Opened 9/18/2026

U.S. Department Of Defense·United States of America

53% match

61--MODULE HIGH VOLTAGE

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Transportation·District of Columbia

53% match

Full Scale Vehicle Crashworthiness Testing and Side Air Bag Out-of-Position Testing for the New Car Assessment Program (NCAP)

Closes 11/2/2026Opened 10/20/2026