This contract awards a comprehensive fire‑protection mitigation and associated site‑work at the Maine Turnpike maintenance facilities in Kennebunk (Mile 25.3). The scope includes installation of a fire‑water main system (HDPE & ductile‑iron), fire‑hydrant and gate‑valve hardware, new sprinkler and alarm systems for three garages, demolition of existing structures, pavement removal and repaving, utility relocation, electrical conduit installation, restroom renovation, and a range of civil and structural concrete work. The work must be completed by early December 2026, with substantial‑completion milestones for fire‑protection (Nov 6 2026) and civil site work (Oct 1 2026).
• Fire‑water distribution: 1,100 lf HDPE pipe, 50 lf ductile‑iron pipe, fire hydrant, valves, testing & disinfection.
• Civil & paving: aggregate sub‑base & base courses, asphalt tack coat, saw cutting, temporary erosion control, and removal/placement of pavement butt joints.
• Structural & mechanical: new sprinkler heads, alarm monitoring, electrical conduit (3‑in. PVC), and restroom fit‑out.
• Environmental compliance: lead‑paint abatement, hazardous‑waste handling, storm‑water best‑management practices.
• Required bid bond (5 % of proposal, min $500) and contract bond equal to total proposal amount.