Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›Carol C. Harter Classroom Building Complex – Building B…

Nevada Government·Nevada

Carol C. Harter Classroom Building Complex – Building B (CHB-B) Hydronic Heating Piping Replacement

Closes 10/9/2026$36k – $54kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Nevada, Las Vegas (UNLV) is seeking qualified contractors to replace the hydronic heating piping throughout Building B of the Carol C. Harter Classroom Building Complex. The scope includes removal of existing piping, installation of new hydronic heating lines, associated valves, pumps, and related mechanical components, and coordination of site work to minimize disruption to building occupants. Bidders must be pre‑qualified with the Nevada State Public Works Division, possess the appropriate Nevada contractor’s license, and comply with prevailing‑wage and apprenticeship requirements. The project is estimated at $450,000 and must be completed under a contract awarded after the electronic bid opening on October 9, 2026. • Mandatory pre‑bid site walk on 9 Sept 2026 (attendance required for qualification) • Questions due by 23 Sept 2026; addenda issued through 30 Sept 2026 • Electronic bid submission via NGEM system; 5 % bid bond required • Contractor must provide performance and payment bonds equal to the bid amount • Compliance with Nevada Prevailing Wage Act and Apprenticeship Utilization Act required • Full project documentation, subcontractor disclosures, and insurance proof required before award.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Grace Scheidt(Senior Purchasing Analyst)

[email protected]

(702) 895-1893

Key dates

Opened
9/8/2026
Questions due
9/23/2026
Pre-bid meeting
9/16/2026Mandatory
Site visit
9/16/2026Mandatory
Closes
10/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
5586-GS Addendum 2

Budget estimate

$36,000 – $54,000

The solicitation states an estimated project cost of approximately $450,000. Assuming the contractor’s profit margin ranges from 8 % to 12 % for a public‑works mechanical contract, the expected earnings would fall roughly between $36,000 and $54,000. Additional revenue could be generated from change orders, overtime, or ancillary services, potentially raising the high‑end estimate.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut UConn Health Center·Connecticut

Top match · 74%

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Horry Georgetown Technical College·South Carolina

72% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

Middlesex Community College·Massachusetts

72% match

Project #MCC 2027-03 HVAC Classroom Renovation Project

Closes 12/2/2026Opened 10/30/2026

NYS OGS Design & Construction - Construction Contractors·New York

72% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

North Carolina Southwestern Community College·North Carolina

71% match

Founders Building Hot Water system rennovation

Closes 11/12/2026Opened 10/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Replace Heating HW Lines, Building 144, Admin, 145 Visitor Waiting & 146 Visitor – HVAC Work

Closes 11/18/2026Opened 9/30/2026

Connecticut Town of Brookfield·Connecticut

69% match

Library HVAC Replacement

Closes 11/12/2026Opened 10/8/2026

Lynwood Unified School District·California

69% match

Abbott Elementary School HVAC Unit Replacement

Closes 11/4/2026Opened 10/1/2026

CUNY Baruch College·New York

69% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Memphis-Shelby County Schools·Tennessee

69% match

RFP 110226JKG HVAC Replacements 5 Locations

Closes 11/2/2026Opened 10/2/2026

San Gabriel Unified School District·California

69% match

2026-Bid-SG-04 Plans Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 10/3/2026

Maryland Howard County Public Schools·Maryland

69% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

NYS OGS Design & Construction - Construction Contractors·New York

69% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Lynwood Unified School District·California

68% match

Abbott Elementary School HVAC Units Replacement Project (Bid No. 03MOT27)

Closes 11/4/2026Opened 10/1/2026

Rialto Unified School District·California

68% match

Carter HVAC Replacement

Closes 12/1/2026Opened 10/28/2026

Stockton Unified School District·California

68% match

RFQ/P #26-27-12 Franklin High School Building "A" HVAC Project

Closes 11/19/2026Opened 10/28/2026

University of Massachusetts System·Massachusetts

68% match

USuites Hot Water Replacement

Closes 11/4/2026Opened 10/21/2026

Christopher Newport University·Virginia

68% match

IFB 242-B5242-002, Forbes Hall Boiler Replacement

Closes 11/17/2026Opened 9/28/2026

Lynwood Unified School District·California

68% match

Abbott Elementary School HVAC Units Replacement – Owner‑Furnished Contractor‑Installed HVAC Units

Closes 11/4/2026Opened 10/1/2026

University of the District of Columbia·District of Columbia

68% match

AHU Replacement & New Boiler

Rolling / TBD closeOpened 3/17/2020

U.S. Department Of Defense·North Carolina

68% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

Memphis-Shelby County Schools·Tennessee

68% match

RFP 110226JKG HVAC Replacements (5 Locations)

Closes 11/22/2026Opened 10/2/2026

Rock Hill School District 3·South Carolina

68% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

North Carolina Robeson Community College·North Carolina

68% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026