The South County Reclaimed Water Phase 2 Pump Station project involves the construction of a pump station facility to maintain adequate pressures in the mandatory reclaimed service area. The project includes the installation of pumps, piping, a seal water system, variable frequency drives, an electrical switchboard, and other associated ancillaries. The contractor will be responsible for providing all necessary materials, equipment, and labor to complete the project. The project requires compliance with various codes and standards, including the Florida Building Code and the International Energy Conservation Code.
Some key aspects of the project include:
• Constructing a pump station facility with a building structure to provide protection and security for the pumps and electrical panels
• Installing pumps, piping, and a seal water system
• Providing variable frequency drives and an electrical switchboard
• Ensuring compliance with environmental conditions and applicable codes and standards
• Conducting testing and startup of the equipment and systems
• Providing operator training and maintenance manuals
The project is expected to be completed under a single lump sum contract, and the contractor will be responsible for all costs associated with the project, including labor, materials, equipment, and testing.