The County of Missoula is soliciting a fixed‑price construction contract to replace two existing mobile restroom units with two permanent, pre‑manufactured restroom/shower buildings at the TSOS site (1975 West Broadway, Missoula, MT). The contractor must demolish existing structures, prepare the site, install new concrete foundations, connect utilities (water, sewer, electrical, gas), and complete full interior and exterior finishes, including accessibility upgrades and temporary restroom provision for the crew. The scope also includes a one‑year workmanship warranty and compliance with Montana prevailing‑wage and residency requirements.
• Demolition of existing trailer units, removal of asphalt, and site grading.
• Installation of new 4‑inch concrete slab, footings, utilities, and placement of prefabricated restroom units.
• Full mechanical, electrical, plumbing, and interior finish work plus provision of four portable restrooms (including two ADA‑compliant) during construction.
• Required bonding (10 % bid bond, performance bond unless <$50k), insurance (GL $1 M/$2 M, auto $1 M, professional $2 M/$4 M), and adherence to safety, waste‑management, and documentation standards.