Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Construction
  5. ›DOC 4JD CBC New Central Office Building

Iowa Department of Administrative Services·Iowa

DOC 4JD CBC New Central Office Building

Closes 5/21/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks competitive sealed‑bid offers for the design‑build construction of a new two‑story, approximately 14,136 sf central office building in Council Bluffs, Iowa. The project will be delivered through multiple prime‑contract packages (general construction, roofing, hydraulic elevator, fire‑suppression, HVAC‑plumbing, and electrical‑communications) with a 5 % bid security requirement. The Owner is the Iowa Department of Administrative Services and the work must comply with 2024 IBC, ADA, and Iowa‑specific procurement rules. • Scope includes structural steel framing, masonry, TPO roofing, interior finishes, mechanical, electrical, plumbing, fire‑suppression, and a hydraulic elevator. • Six distinct bid packages (BP‑01 through BP‑06) are to be bid separately; no combined “single‑prime” bid is accepted. • Mandatory bid documents: completed bid form, nondiscrimination certification, targeted small‑business information, and 5 % bid bond. • Key calendar dates: optional pre‑bid meeting May 5 2026, questions due May 8 2026, substitution requests due May 11 2026, bid submission May 21 2026 2 PM, bid opening May 21 2026 3 PM, construction start June 15 2026, completion June 18 2027.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Bradbury(Purchasing Agent)

[email protected]

(515) 823-9327

Key dates

Opened
4/27/2026
Questions due
5/8/2026
Pre-bid meeting
5/5/2026
Closes
5/21/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
RFB948800-01

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed, but based on typical office construction costs in Iowa (≈ $150‑$250 per square foot) for a 14,136 sf building, total construction spend is likely between $2.1 million and $3.5 million. Adding allowances for the hydraulic elevator, fire‑suppression, and specialized finishes could push the upper bound to roughly $5 million. Therefore a reasonable earnings range for the contractor would be about $2 million to $5 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

York Technical College·South Carolina

Top match · 61%

YTC - Welding Expansion - Building D **READVERTISEMENT - Documents May Be Obtained From Location**

Closes 11/12/2026Opened 10/14/2026

North Carolina Robeson Community College·North Carolina

61% match

Health Care Education Building- New Construction

Closes 12/8/2026Opened 8/31/2026

The University of North Carolina·North Carolina

60% match

Firestone Lab Renovation - College of Veterinary Medicine (CVM) Main Building

Closes 11/4/2026Opened 10/6/2026

York Technical College·South Carolina

60% match

YTC - Welding Expansion - Building D

Closes 11/12/2026Opened 10/9/2026

North Carolina Central University·North Carolina

59% match

NC Central University

Closes 11/12/2026Opened 10/13/2026

Connecticut UConn Health Center·Connecticut

59% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

Clemson University·South Carolina

59% match

Johnstone Site Housing

Closes 11/18/2026Opened 10/22/2026

University of South Carolina·South Carolina

59% match

Civil Rights Center Construction

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Energy·Illinois

58% match

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Closes 12/17/2026Opened 10/6/2026

NYS Lancaster, Village of·New York

58% match

43 Central Ave Bid for Build Out of Three New Apartments

Closes 11/20/2026Opened 10/28/2026

The University of North Carolina·North Carolina

58% match

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026

City of Lawrence·Massachusetts

58% match

New Administration Building Lawrence Municipal Airport Construction IFB

Closes 11/10/2026Opened 8/18/2026

City of Charlotte·North Carolina

58% match

Firehouse 44

Rolling / TBD closeOpened 1/1/2026

Columbus State Community College·Ohio

58% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

Northern Virginia Community College·Virginia

58% match

260-B5260-015 NVCC LC Relocate Fitness Center

Closes 11/10/2026Opened 9/24/2026

Dillon School District Four·South Carolina

58% match

Dillon School District Four Storage Building

Closes 11/12/2026Opened 10/14/2026

Horry Georgetown Technical College·South Carolina

58% match

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

City of St. Cloud·Florida

58% match

City Hall 3rd Floor Renovations

Closes 11/19/2026Opened 10/4/2026

U.S. General Services Administration·South Dakota

58% match

Renewal Advertisement: 2,422 ABOA Square Feet of Office Space in Sioux Falls, SD 6OH0390

Closes 11/13/2026Opened 10/30/2026

Riverside Unified School District·California

58% match

New District Office Data Installation

Closes 11/17/2026Opened 10/10/2026

North Carolina Central Carolina Community College·North Carolina

58% match

Advertisement for Bid - Moore Center Multipurpose Suite Renovation

Closes 12/9/2026Opened 10/30/2026

UCLA Capital Programs·California

57% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 20 - Interior Signage)

Rolling / TBD closeOpened 10/23/2026

Washington Enterprise Services (DES), Dept. of·Washington

57% match

DOC - CBCC Elevator Modernization Support Building - Rebid

Closes 11/5/2026Opened 10/8/2026

UCLA Capital Programs·California

57% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

The University of North Carolina·North Carolina

57% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026