The City of Reno is soliciting bids to replace the existing pedestrian bridge at Paradise Park. The work includes full demolition of the current bridge and its supports, construction of new concrete abutments, wingwalls, and footings, and installation of a prefabricated steel truss bridge supplied by the owner. Additional scope comprises asphalt pavement replacement, new concrete curbs and handrails, installation of bollards, rip‑rap channel restoration, utility relocations, landscaping, and comprehensive storm‑water protection.
• Demolition and disposal of existing bridge, abutments, footings, and related utilities.
• New concrete abutments, wing‑walls, and footings designed to 3,500 psf bearing pressures.
• Installation of a Wheeler 88‑5′ × 8′ prefabricated steel pedestrian bridge.
• Replacement of asphalt pavement, concrete curbs, handrails, and installation of removable bollards.
• Utility relocation (water, sewer, storm, gas, electrical, communications) and storm‑water BMPs.
• Landscaping, tree protection, and rip‑rap/channel restoration.
• Required permits, special inspections, SWPPP, and compliance with Nevada prevailing‑wage rules.