Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Midway Pump Station Telemetry System Improvements and…

Miami-Dade County Department of Transportation and Public Works·Florida

Midway Pump Station Telemetry System Improvements and Drainage Improvements Multiple Sites

Closes 5/6/2026$1M – $2MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for combined telemetry upgrades and extensive drainage improvements at multiple sites surrounding the Midway Pump Station in Miami‑Dade County. The work includes civil‑construction (drainage structures, French drains, catch basins, road restoration, sidewalks, curbs, grading, sodding) and the installation/upgrade of SCADA‑compatible telemetry equipment (solar panels, RTUs, radar level sensors, ultrasonic sensors, communication modules) supplied by Emerson Process Management. The contractor must also handle permitting, traffic control, erosion and sediment control, and provide performance and payment bonds. • Upgrade telemetry hardware at three locations (Pollution Control Structure, Midway Pump Station, Energy Dissipating Structure) and integrate into County SCADA network. • Construct/rehabilitate drainage infrastructure along NW 7 St (NW 82 Ave to NW 76 Ave) and NW 79 Ave (W. Flagler St to NW 7 St), including pipe installation, exfiltration trenches, and roadway restoration. • Provide all required permits, traffic‑control plans, SWPPP, and complete testing/acceptance of the telemetry system with a 30‑day operational demonstration.

Attached files

Contact

Elva Rosa Reyes(Capital Improvements Engineer)

[email protected]

(305) 375-2930

Key dates

Opened
3/12/2026
Pre-bid meeting
4/2/2026
Closes
5/6/2026
Duration
600 days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
237110
Solicitation №
20260067

Budget estimate

$1,000,000 – $2,000,000

The solicitation’s Volume 2 lists total project funding of $1,503,000 (combined state grant and matching funds). Assuming a typical contractor margin of 10‑30 %, the net earnings for the winning firm would likely fall between $150,000 and $450,000. Accounting for potential change‑orders, bond costs, and retainage, a realistic overall contract value range is roughly $1 million to $2 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Waynesboro·Virginia

Top match · 70%

Shenandoah Village Drive Pump Station Replacement and System Improvements Contract I

Closes 11/10/2026Opened 9/30/2026

City of Charlotte·North Carolina

70% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Massachusetts Town of Marion·Massachusetts

70% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

Gwinnett County Government·Georgia

70% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

City of Fresno·California

69% match

Wellhead Treatment Improvements at Pump Station 102A

Closes 11/17/2026Opened 10/20/2026

Charles County Government·Maryland

68% match

Cobb Island and Hill Road Pump Station Improvements (UN 1308\UN 1309)

Closes 11/4/2026Opened 9/24/2026

City of South San Francisco·California

68% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

City of Douglas·Wyoming

68% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Montpelier·Vermont

68% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

City of San Diego·California

68% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Alexandria·Louisiana

68% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

City of High Point·North Carolina

68% match

Bid 08-120226 - Riverdale Pump Station Improvements

Closes 12/2/2026Opened 10/20/2026

City of Mandeville·Louisiana

68% match

ITB: LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/24/2026Opened 10/28/2026

City of Troy, OH·Ohio

67% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026

City of Frazee, Minnesota·Minnesota

67% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Miami‑Dade County Water & Sewer Department·Florida

67% match

Pump Station 0812 Relocation and Upgrade

Closes 12/1/2026Opened 10/16/2026

Johnson County Wastewater·Kansas

67% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Jackson County Utility Authority·Mississippi

67% match

Pump Station #20 Rehab

Closes 11/17/2026Opened 9/20/2026

Louisiana City of Mandeville·Louisiana

67% match

LIFT STATION 28, G, & H UPGRADES; C.O.M. PROJECT NO.: 212.25.001

Closes 11/25/2026Opened 10/14/2026

Metropolitan Council·Minnesota

67% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

Carroll County·Maryland

67% match

Design Upgrades to the Sykesville Pumping Station

Closes 12/9/2026Opened 10/21/2026