The Marin County Flood Control and Water Conservation District is seeking a qualified consulting firm to conduct an alternatives study and produce a 30 % preliminary design update for the Corte Madera Creek Flood Risk Management Project. The work focuses on replacing an aging fish ladder with a hydraulically‑neutral transition structure that does not increase Base Flood Elevations on any non‑District property. The consultant must attend a mandatory site‑visit, prepare technical studies (hydrologic/hydraulic modeling, fish‑ladder condition assessment), develop at least two viable design alternatives, and deliver a preliminary design package with cost estimates and an implementation plan. The scope also includes project management, monthly progress reporting, and coordination with the District.
• Alternatives Study: data review, H&H modeling, feasibility of ≥ 2 alternatives, public workshops.
• Preliminary Design Update: draft/final design drawings, cost estimate, permitting pathway, implementation plan.
• Project Management: monthly updates, invoicing, meetings, compliance with District insurance and GIS data standards.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.