Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Education RFPsEducation Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More education bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Education
  5. ›Large Lakes Observatory

University of Minnesota·Minnesota

Large Lakes Observatory

Closes 6/1/2026$6M – $12MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Minnesota is seeking a design team for the Large Lakes Observatory (LLO) project, which includes constructing a new research laboratory building on the Duluth campus and a waterfront facility to support field research vessels. The project aims to provide a permanent home for field research vessels at Lake Superior and support research activities in a portside building. The design team will be responsible for all services and deliverables necessary to complete the predesign, schematic design, design development, construction documents, bidding/negotiation, and construction administration phases. The project must meet the Minnesota Sustainable Building Guidelines (B3) and the Sustainable Building 2030 program. The selected respondent will be required to execute the current AIA Document B101, as amended by the University of Minnesota. Key considerations include the team's experience with similar projects, ability to deal with aesthetic factors, and commitment to diversity and inclusion. Some key points to consider are: • The project involves the construction of a new research lab facility and a waterfront operations facility. • The design team must have experience with sustainable building guidelines and energy standards. • The project requires a commitment to diversity and inclusion, with a goal of achieving a 10% Targeted Group/Economically Disadvantaged/Veteran-Owned subcontracting goal. • The selected respondent will be required to provide a detailed schedule and budget for the project. • The project will be delivered via a Construction Manager at Risk (CM@R) method. • The University of Minnesota has a Climate Action Plan, and the project must consider the implications of moving towards net zero operational carbon.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mandi T. Bailey(Design Project Manager)

[email protected]

Key dates

Opened
5/11/2026
Questions due
5/22/2026
Pre-bid meeting
5/20/2026Mandatory
Site visit
5/20/2026Mandatory
Closes
6/1/2026
Duration
24 months (construction phase), with the entire project spanning approximately 6 years from the start of predesign to the end of commissioning.

Last updated

Details

Type
Request for Proposal
Industry
Education
NAICS
541310
Solicitation №
26-04 Addendum 1

Budget estimate

$6,000,000 – $12,000,000

The estimated construction cost for the project is $60,000,000, which includes the demolition of the current Old Chemistry building and the construction of a new research lab building. The cost of the waterfront facility will be estimated during the predesign phase. Based on the scope of the project, which includes designing and constructing two new facilities, providing professional design services, and meeting specific sustainability standards, the total budget for the selected design team could range from $6,000,000 to $12,000,000, considering typical architectural and engineering fees ranging from 10% to 20% of the total construction cost. Factors influencing this estimate include the complexity of the design, the experience of the design team, and the specific requirements of the project, such as meeting the Minnesota Sustainable Building Guidelines (B3) and the Sustainable Building 2030 program.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan Department of Environment, Great Lakes, and Energy·Michigan

Top match · 59%

Notice of Award of Water Quality Monitoring Services

Closes 9/25/2030Opened 9/24/2024

U.S. Geological Survey·United States of America

58% match

Cooperative Agreement for Affiliated Partner with the Great Lakes-Northern Forest Cooperative Ecosystem Studies Unit (CESU)

Closes 11/14/2026Opened 10/14/2026

Illinois Natural Resources·Illinois

57% match

AIS Grants to Great Lakes States (FY26)

Rolling / TBD closeOpened 6/17/2025

Illinois Natural Resources·Illinois

57% match

Invasive Carp Management Control in IL Waterway GLRI (FY25) (CAFWS-176 170, and 164)

Rolling / TBD closeOpened 5/20/2024

U.S. DOC NOAA - ERA Production·United States of America

57% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

Illinois Natural Resources·Illinois

57% match

AIS Grants to Great Lakes States (CAFWS-179)

Rolling / TBD closeOpened 1/1/2026

Illinois Natural Resources·Illinois

57% match

AIS Grants to Great Lakes States (FY24)

Rolling / TBD closeOpened 6/1/2024

U.S. Geological Survey·United States of America

56% match

Cooperative Agreement for affiliated Partner with Great Lakes-Northern Forest Cooperative Ecosystem Studies Unit

Closes 11/14/2026Opened 10/14/2026

National Aeronautics And Space Administration·United States of America

56% match

System Vicarious Calibration (SVC) of the NASA Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Ocean Color Instrument (OCI) Using HyperNAV

Closes 11/2/2026Opened 10/16/2026

Illinois Natural Resources·Illinois

56% match

Invasive Carp Management Control in IL Waterway GLRI (FY26)

Rolling / TBD closeOpened 12/21/2025

Illinois Natural Resources·Illinois

56% match

State ANS Comprehensive Management Plan (CAFWS-180)

Rolling / TBD closeOpened 11/1/2025

Illinois Natural Resources·Illinois

56% match

BIG-P - Boating Infrastructure Grant Program (SFY25)

Rolling / TBD closeOpened 8/7/2023

California Grants·California

55% match

Science and Lake Improvement Account Program

Rolling / TBD closeOpened 6/23/2025

Illinois Natural Resources·Illinois

55% match

Invasive Carp Management Control in IL Waterway GLRI (CAFWS-183)

Rolling / TBD closeOpened 1/1/2026

U.S. Department Of Defense·Virginia

55% match

NGA - Boosting Innovative GEOINT - Science & Technology Broad Agency Announcement (BIG-ST BAA): Topic # 07 – Lidar Analysis for Surface & Environmental Reconnaissance (LASER)

Closes 12/21/2026Opened 10/1/2026

Illinois Natural Resources·Illinois

55% match

AIS Grants to Great Lakes States (FY25)

Rolling / TBD closeOpened 6/1/2024

Massachusetts Executive Office of Energy and Environmental Affairs·Massachusetts

55% match

Forest Carbon Remote Sensing RFI

Closes 11/9/2026Opened 10/14/2026

Illinois Natural Resources·Illinois

55% match

State ANS Comprehensive Management Plan (FY26))

Rolling / TBD closeOpened 3/1/2025

U.S. Department Of Defense·Kansas

55% match

Law Enforcement Services for Pearson-Skubitz Big Hill Lake, Labette County, Kansas

Closes 11/16/2026Opened 10/30/2026

Illinois Natural Resources·Illinois

55% match

State ANS Comprehensive Management Plan (FY25)

Rolling / TBD closeOpened 3/1/2024

U.S. Geological Survey·United States of America

55% match

Cooperative Agreement for affiliated Partner with Great Basin Cooperative Ecosystem Studies Unit

Closes 11/30/2026Opened 10/30/2026

LA Water & Power·California

55% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

U.S. Fish and Wildlife Service·United States of America

55% match

F26AS00084 Aquatic Invasive Species Grants to Great Lakes Tribes - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 5/7/2026

State of Missouri Office of Administration·Missouri

55% match

Big Lake State Park - Reclaim & Stabilize Marsh Phase 1 Campgrounds

Closes 12/1/2026Opened 11/9/2026

U.S. Fish and Wildlife Service·United States of America

54% match

F26AS00085 Aquatic Invasive Species Interjurisdictional Grants to the Great Lakes States and Tribes - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 5/20/2026