The San Diego Unified School District is modernizing the entire Valencia Park Elementary School campus through a Lease‑Lease‑Back, best‑value procurement. The work includes demolition of five portable classrooms, construction of a new 600 sf classroom, extensive interior upgrades (doors, windows, flooring, mechanical systems, structural improvements), and site‑wide enhancements such as new shade structures, playground equipment, asphalt resurfacing, a retaining wall, and a fully upgraded kitchen. The project is budgeted at $36‑$37 million and will be executed over a 24‑month construction period. Subcontractors must be pre‑qualified with both the District and Balfour Beatty, comply with SB 854/DIR, prevailing‑wage, DVBE/EBE goals, and provide bonds for contracts over $100 k.
• Whole‑site modernization of a K‑8 campus (≈5 buildings + new 600 sf building).
• Major trades: demolition, concrete, masonry, HVAC, electrical, plumbing, doors/windows, flooring, roofing, site work, landscaping, playground equipment, fire‑alarm and access‑control systems.
• Mandatory pre‑qualification, SB 854 registration, PSA assent, and 3 % DVBE participation required.