PLEASE NOTE ALL UNIT PRICING AND ALTERNATES AND INCLUDE ACCORDINGLY
SCOPE INCLUDES: Selective/Minor Demolition, Concrete Foundations and Slab, Rebar, Masonry, Structural Steel and Joist, Millwork and Cabinetry/Countertops, Thermal Insulation, Weather Barriers, Composite Wall Panels, Firestopping, Joint Sealants, Doors/Frames/HDWE, Aluminum Entrances and Storefronts, Glass and Glazing, Metal Stud/Drywall/Acoustical Ceilings, Resilient Flooring, Sound Absorbing Wall and ceiling units, Painting, Sitework, Paving, Utilities
WAGE = Prevailing Wage
TAX = TAX EXEMPT
SCHEDULE = January 2026 – June 2026
SPECIAL NOTES:
** If you are emailing your bid within a half hour of the bid time, PLEASE additionally fax (716-633-6956) it and/or call in your proposal – due to email server delays
** All RFI’s and questions to be forwarded to the contractor via email Michael Glomb at
[email protected] (not the Architect or Owner).
** Bid Proposals should be forwarded in PDF file format please.
** Please forward your scope sheet or proposal by the End of the Day before the bid is due please, most specifically with your inclusions and exclusions.
Minority / Women Business Enterprise contracting goals (MWBE)
Total MWBE Goals: 30.00%