Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›ECONOMEDES HIGH SCHOOL CHILLER REPLACEMENT

Edinburg ISD·Texas

ECONOMEDES HIGH SCHOOL CHILLER REPLACEMENT

Closes 10/7/2026$900k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Edinburg Consolidated Independent School District (ECISD) is soliciting competitive sealed proposals to replace the chiller system at J. Economedes High School. The work includes removal of existing chillers, installation of new air‑cooled chillers (approximately 450 tons total), associated condenser pipe replacement, integration with existing Trane central plant controls, testing, balancing, and a temporary rental chiller for up to eight weeks. The contractor must provide all labor, materials, equipment, permits, and supervision, coordinate with utilities, and guarantee workmanship for at least one year. Proposals are to be submitted in sealed envelopes by 3:30 PM on 10 Oct 2026; a pre‑bid conference is scheduled for 30 Sept 2026. A 5 % bid bond is required, and the contract will be awarded to the “best value” bidder. • Scope: HVAC/chiller replacement, pipe work, controls integration, testing & balancing. • Location: Edinburg, Texas (ECISD facilities). • Contract type: Lump‑sum, competitive sealed proposal. • Key dates: Issue 9/19/2026, Pre‑bid 9/30/2026, Questions due 10/2/2026, Bid deadline 10/7/2026. • Mandatory bond: 5 % of total proposal. • Substantial completion target: 30 July 2027 (≈10 months). • Required documents: Drawings, qualifications, past performance, subcontractor list, insurance, bid bond, etc. • No sales tax to be included (exempt organization).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

ClauDina E. Longoria(Senior Buyer)

[email protected]

(956) 289-2311

Key dates

Opened
9/19/2026
Questions due
10/2/2026
Pre-bid meeting
9/30/2026
Closes
10/7/2026
Duration
10 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238220
Solicitation №
27-03 Addendum 2

Budget estimate

$900,000 – $1,500,000

The solicitation does not disclose the contract value. A full‑scale high‑school chiller replacement (≈450 tons) typically ranges from $1 million to $2 million depending on equipment specifications, labor rates in South Texas, and the need for temporary rental equipment. The estimate assumes mid‑range equipment, standard labor costs, and a modest contingency. Factors that could raise the amount include premium chiller brands, extensive utility relocations, or accelerated schedule requirements; a lower‑end scope or use of standard‑spec equipment could bring the total closer to $900 k.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Rock Hill School District 3·South Carolina

Top match · 73%

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

73% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

University of Missouri-Kansas City·Missouri

72% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Maryland Howard County Public Schools·Maryland

71% match

054.27.B3 Harper’s Choice Middle School Chiller & Cooling Tower Replacement

Closes 12/3/2026Opened 10/29/2026

Town of Arlington·Massachusetts

71% match

14-02 Peirce School Chiller Project

Rolling / TBD closeOpened 1/30/2014

NYS OGS Design & Construction - Construction Contractors·New York

70% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

University of South Carolina·South Carolina

69% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

Trident Technical College·South Carolina

68% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

Lynwood Unified School District·California

68% match

Abbott Elementary School HVAC Unit Replacement

Closes 11/4/2026Opened 10/1/2026

Trident Technical College·South Carolina

67% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

UCLA Capital Programs·California

67% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

Stafford County Public Schools·Virginia

67% match

Replace Mechanical Systems II at Rocky Run Elementary School

Closes 11/23/2026Opened 10/28/2026

University of Massachusetts·Massachusetts

67% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026

Manhattan-Ogden Schools USD 383·Kansas

67% match

USD 383 Theodore Roosevelt and Bluemont HVAC Replacement

Closes 11/4/2026Opened 10/16/2026

Washington Enterprise Services (DES), Dept. of·Washington

66% match

Wenatchee Valley College- Batjer Chiller Replacement

Closes 11/17/2026Opened 10/23/2026

Rialto Unified School District·California

66% match

Carter HVAC Replacement

Closes 12/1/2026Opened 10/28/2026

Monroe County School District, FL·Florida

66% match

ITB 2026023 - AC Repairs and Replacements

Closes 11/19/2026Opened 10/22/2026

Henrico County·Virginia

66% match

Fair Oaks Elementary School Cooling Tower Replacement

Closes 11/17/2026Opened 10/20/2026

Jefferson County Public Schools·Kentucky

66% match

RFP 3200 - C/N for Walk-In Cooler/Freezer Units and Installation for Phase 45 Various Schools

Closes 11/17/2026Opened 10/23/2026

University of South Carolina·South Carolina

66% match

Chiller and Infrastructure Replacement- North E #2

Closes 11/4/2026Opened 9/26/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

66% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 11/5/2026Opened 10/1/2026

Henrico County Government·Virginia

66% match

ITB No. 26-2999-9EAR - Fair Oaks Elementary School Cooling Tower Replacement

Closes 11/17/2026Opened 10/20/2026

Lynwood Unified School District·California

66% match

Abbott Elementary School HVAC Units Replacement Project (Bid No. 03MOT27)

Closes 11/4/2026Opened 10/1/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

65% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 10/29/2029Opened 10/1/2026