The Steuben County Department of Public Works is seeking bids for the construction of Cell 6A and a leachate storage tank at the Bath Landfill. The project includes the installation of a liner system, leachate storage tank, and associated piping and equipment. The contractor will be responsible for abandoning existing environmental monitoring wells and installing new ones. The project also includes the installation of a process control system and instrumentation and control for process systems.
• The project requires the construction of a leachate storage tank with a capacity of approximately 2.5 million gallons.
• The contractor must abandon two existing environmental monitoring wells and install three new ones.
• The project includes the installation of a process control system, including a control panel, variable frequency drives, and instrumentation and control devices.
• The contractor must provide a detailed design for the process control system and instrumentation and control for process systems.
• The project requires the installation of piping, valves, and other equipment for the leachate storage tank and process control system.