Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Development of Technology Readiness Level (TRL) 9…

U.S. Department Of Defense·Virginia

Development of Technology Readiness Level (TRL) 9 Frequency Inverter-Converter for the 3 kW Tactical Quiet Generator (TQG)

Closes 7/11/2026$500k – $5MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of the Army is conducting market research to identify sources capable of developing a Frequency Inverter-Converter based on the furnished Government drawing, 98-19604. The contractor will be responsible for integrating the frequency inverter-converter system into a Government Furnished 3 kW TQG. The system must meet standard military requirements for environmental durability and endurance/reliability. The contractor must provide a capability statement that addresses the questions in Section 3 of the RFI, including company overview, current status, experience, design and engineering, production and manufacturing capabilities, testing and validation capabilities, and programmatic information. Some key points to consider include: • The contractor must have experience with printed circuit boards (PCB) design and must have the ability to design and print PCB in-house. • The contractor must have experience designing frequency inverter-converters (for generators) with linear and non-linear loads. • The contractor must have experience designing systems with insulated-gate bipolar transistors (IGBTs) and optocouplers. • The contractor must have production and manufacturing capabilities, including the ability to coordinate the shipping of the final systems to their destination. • The contractor must have testing and validation capabilities, including environmental testing, MIL-STD 810 testing, and compliance testing.

Attached files

Contact

Keane Sablon(Contract Specialist)

[email protected]

(520) 671-2289

Key dates

Opened
6/11/2026
Questions due
6/24/2026
Closes
7/11/2026

Last updated

Details

Type
Request for Information
Industry
Aerospace and Defense
NAICS
335999
Solicitation №
W909MY-26-R-FIC

Budget estimate

$500,000 – $5,000,000

The budget for this opportunity is difficult to estimate, as the document does not provide a specific amount. However, based on the scope of the project, which involves the development, production, and testing of a Frequency Inverter-Converter system, the budget could be substantial. The cost of developing and producing the system will depend on various factors, including the complexity of the design, the materials and labor required, and the testing and validation procedures. A rough estimate for the development and production of the system could be in the range of $500,000 to $2 million, depending on the scope and complexity of the project. The budget could also include additional costs for testing, validation, and maintenance of the system, which could add hundreds of thousands of dollars to the total budget. Overall, the budget for this opportunity could be in the range of $500,000 to $5 million, depending on the specifics of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Utah

Top match · 68%

Control, Generator

Closes 11/23/2026Opened 10/8/2026

U.S. Department Of Defense·Texas

67% match

Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army Depot

Closes 11/13/2026Opened 10/18/2026

U.S. Department Of Defense·Georgia

67% match

Radio Frequency Power 18:1 Divider/Combiner

Closes 11/30/2026Opened 6/24/2026

City of Muskogee·Oklahoma

67% match

Request for Qualification (RFQ) Engineering Services/Fuel Station Generator

Rolling / TBD closeOpened 7/30/2026

U.S. Department Of Defense·Ohio

66% match

Electricity 2027

Closes 11/9/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

66% match

59--CONVERTER,FREQUENCY, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

66% match

Solid-State Energy Conversion from Heat to Electricity Request for Information (RFI)

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

66% match

Power Distribution and Illumination Systems, Electrical (PDISE)

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·Utah

66% match

FD2020-23-00149

Closes 11/14/2027Opened 11/15/2022

U.S. Department Of Defense·California

66% match

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Closes 3/31/2027Opened 3/31/2026

U.S. Department Of Defense·United States of America

66% match

POWER DISTRIBUTION

Closes 11/6/2026Opened 10/8/2026

U.S. Department Of Defense·Florida

66% match

UAS AND TRACR II INTERFACE CONTROL DOCUMENT (ICD) COMPLIANCE

Closes 11/22/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

65% match

POWER SUPPLY

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·Ohio

65% match

Request for Information (RFI) – Modular Tactical Signals Intelligence (SIGINT) EW System

Closes 11/18/2026Opened 10/19/2026

Tarrant Regional Water District·Texas

65% match

RFSOQ for Electrical Support

Closes 11/19/2026Opened 10/12/2026

U.S. Department Of Defense·Maryland

65% match

Diesel Engine, Starter Motor, Magnetic Contactors, Powerpack & Alternators Supporting 800kW, 60 Hz DPGDS - Non-Commercial NSN's

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Homeland Security·District of Columbia

65% match

Explosive Trace Detection (ETD) Qualified Products List (QPL)

Closes 4/30/2027Opened 9/1/2026

U.S. Department Of Defense·United States of America

65% match

Operations and Maintenance of Frequency Converters and Electrical Systems for the Egyptian Navy

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

59--SWITCH,PRESSURE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

65% match

Electrical and Electronic Properties Measuring and Testing Instruments

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·Alabama

65% match

V250 AND TMS KIT

Closes 12/1/2026Opened 11/17/2025

U.S. Department Of Homeland Security·United States of America

65% match

Advanced Imaging Technology (AIT) Qualified Product List (QPL)

Closes 1/30/2027Opened 1/30/2026

U.S. Department Of Defense·United States of America

65% match

GENERATOR, ALTERNATING

Closes 11/2/2026Opened 10/19/2026

Lansing Board of Water & Light·Michigan

65% match

Transformer RFQ

Closes 11/4/2026Opened 10/15/2026

U.S. Department Of Homeland Security·Virginia

65% match

Advanced Imaging Technology (AIT) Qualified Product List (QPL)

Closes 9/30/2027Opened 10/21/2026