The County of Marin is seeking a qualified contractor to perform Phase 1 of the Lomita Drive Road Rehabilitation. The work includes full‑depth roadway reconstruction, pavement overlay, curb and retaining‑wall reconstruction, sidewalk construction, storm‑drain pipe and inlet installation, utility adjustments, and complete signing and striping. The engineered estimate for the project is $1.5 million, with a contract period of 45 working days once awarded. Bidders must hold a valid California Class “A” contractor’s license, provide a 10 % bid security, and comply with prevailing‑wage requirements. Submissions are due electronically via BidExpress by 2:30 pm on August 19, 2026, with a live Zoom bid opening at the same time.
• Scope: pavement (cold‑plane & HMA overlay), full‑depth reconstruction, curbs, retaining walls, sidewalks, storm‑drain system (including new 30‑in. RCP pipe), utility adjustments, signing/striping.
• Schedule: 45 working days to complete; bid deadline August 19, 2026 2:30 pm; bid opening via Zoom at same time.
• Requirements: Class “A” license, 10 % bid bond, 60‑day bid validity, prevailing‑wage compliance, performance and payment bonds (100 % of bid), insurance minimums, off‑road diesel compliance, low‑carbon concrete specifications.