Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›ENG RFP - 41EG2104 Lomita Drive Road Rehabilitation: Phase 1

County of Marin·California

ENG RFP - 41EG2104 Lomita Drive Road Rehabilitation: Phase 1

Closes 8/19/2026$1.4M – $1.6MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Marin is seeking a qualified contractor to perform Phase 1 of the Lomita Drive Road Rehabilitation. The work includes full‑depth roadway reconstruction, pavement overlay, curb and retaining‑wall reconstruction, sidewalk construction, storm‑drain pipe and inlet installation, utility adjustments, and complete signing and striping. The engineered estimate for the project is $1.5 million, with a contract period of 45 working days once awarded. Bidders must hold a valid California Class “A” contractor’s license, provide a 10 % bid security, and comply with prevailing‑wage requirements. Submissions are due electronically via BidExpress by 2:30 pm on August 19, 2026, with a live Zoom bid opening at the same time. • Scope: pavement (cold‑plane & HMA overlay), full‑depth reconstruction, curbs, retaining walls, sidewalks, storm‑drain system (including new 30‑in. RCP pipe), utility adjustments, signing/striping. • Schedule: 45 working days to complete; bid deadline August 19, 2026 2:30 pm; bid opening via Zoom at same time. • Requirements: Class “A” license, 10 % bid bond, 60‑day bid validity, prevailing‑wage compliance, performance and payment bonds (100 % of bid), insurance minimums, off‑road diesel compliance, low‑carbon concrete specifications.

Attached files

Contact

Rachel Calvert(Senior Civil Engineer)

[email protected]

(415) 246-5017

Key dates

Opened
8/6/2026
Closes
8/19/2026
Duration
45 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
41EG2104

Budget estimate

$1,400,000 – $1,600,000

The engineered estimate for the project is $1.5 million. Considering typical contractor margins (10‑15 %) and potential change‑order contingencies, the expected net earnings for a qualified bidder would likely fall between $1.4 million and $1.6 million. This range accounts for labor, materials, equipment, and the required retainage and bond costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Bernardino County·California

Top match · 73%

Muscoy Area Rehabilitation - Phase 1

Closes 12/3/2026Opened 10/27/2026

City of Lancaster·Texas

71% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

U.S. Department Of Veterans Affairs·California

70% match

Y1LB--FY27 NRM - Correct Mather Loop Road and Install Speed Bumps

Closes 11/2/2026Opened 10/26/2026

Lowndes County·Georgia

70% match

TIA-15: Resufacing Phase I

Closes 11/12/2026Opened 10/7/2026

Georgia Lowndes County Board of Commissioners·Georgia

69% match

TIA-15: Resurfacing Phase I

Closes 11/12/2026Opened 10/7/2026

Navajo Technical University·New Mexico

69% match

RFP – Campus Parking Lots & Circular Road | Pavement Rehabilitation & Repaving

Closes 11/20/2026Opened 10/16/2026

Illinois Tollway·Illinois

69% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Los Angeles County Public Works·California

69% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

California Department of Transportation·California

69% match

RHMA, modifying signal and lighting systems and minor concrete.

Closes 12/2/2026Opened 10/26/2026

Bay County·Florida

68% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

NYS PRIDE of Ticonderoga·New York

68% match

RFP Opportunity - Rehabilitation of 85 & 105 Montcalm Street

Closes 11/5/2026Opened 10/15/2026

Modoc County Road Department·California

68% match

FOR CONSTRUCTION OF MODOC COUNTY ROAD 1 REHABILITATION PROJECT FROM THE INTERSECTION OF COUNTY ROAD 9 TO THE B.L.M. BOUNDARY

Closes 11/12/2026Opened 10/1/2026

Municipality of Anchorage·Alaska

68% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

City of Santa Rosa·California

67% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

Bay County, FL·Florida

67% match

27-04 FY27 Annual Resurfacing Phase 1 (Local Roads)

Closes 12/2/2026Opened 10/27/2026

City of Shawnee·Kansas

67% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

Massachusetts Town of Westborough·Massachusetts

67% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

Town of Church Point·Louisiana

67% match

2026-27 ROAD IMPROVEMENTS PROJECT PHASE 1

Closes 11/10/2026Opened 10/14/2026

California Department of Transportation·California

67% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

City of Coronado·California

67% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026