Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Recreational Trails Grant Program 2022 Shiloh Bike Trails

City of Laredo·Texas

Recreational Trails Grant Program 2022 Shiloh Bike Trails

Closes 6/17/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Laredo is seeking bids for the construction of a 10' wide shared-used hike and bike trail spanning 1775 LF, including two cast-in-place box culverts, landscaping, installation of rock berms, lighting, bike repair stands, and signage. The project also includes the construction of a 4" reinforced concrete pavement at 10' width. The city requires bidders to submit their proposals electronically through the Cit-E-Bid system or in-person hand delivery. The bid package includes various items such as mobilization and bonding, excavating, clearing and grubbing, import fill, subgrade preparation, and reinforced concrete pavement. • The project requires the construction of a 10' wide shared-used hike and bike trail • The project includes the construction of two cast-in-place box culverts • The project requires the installation of rock berms, lighting, bike repair stands, and signage • The project includes the construction of a 4" reinforced concrete pavement at 10' width • The bid package includes various items such as mobilization and bonding, excavating, clearing and grubbing, import fill, subgrade preparation, and reinforced concrete pavement

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Eliud De Los Santos(Engineering Department)

[email protected]

(956) 791-7346

Key dates

Opened
5/28/2026
Questions due
6/5/2026
Pre-bid meeting
6/3/2026
Closes
6/17/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
FY24-ENG-07 Addendum 1

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes the construction of a 10' wide shared-used hike and bike trail, two cast-in-place box culverts, landscaping, installation of rock berms, lighting, bike repair stands, and signage. The estimated cost of the project can range from $500,000 to $2,000,000, considering the materials, labor, and equipment required for the project. The city may also require additional services such as engineering and inspection, which can add to the overall cost.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Laredo·Texas

Top match · 77%

FY27-ENG-007 - Recreational Trails Grant Program 2022 Shiloh Bike Trails – Emergency Towers and Bike Repair Stations - Engineering Department

Closes 11/6/2026Opened 10/22/2026

Alaska Department of Transportation and Public Facilities·Alaska

74% match

RTP Grant Application - Eastland Trails Phase 2A

Rolling / TBD closeOpened 9/24/2026

California Grants·California

71% match

The Recreational Trails Program (RTP) – R27

Closes 11/2/2026Opened 10/1/2026

Alaska Department of Transportation & Public Facilities·Alaska

70% match

RTP Grant Application - Yellow Hill Lake Trail

Rolling / TBD closeOpened 9/24/2026

Alaska Department of Transportation and Public Facilities·Alaska

69% match

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026

Alaska Department of Transportation and Public Facilities·Alaska

68% match

RTP Grant Application - Kennicott McCarthy Recreation Alliance (KMRA)

Rolling / TBD closeOpened 9/24/2026

Alaska Department of Transportation and Public Facilities·Alaska

68% match

RTP Grant Application - Twin Coves Public Use Cabin

Rolling / TBD closeOpened 9/24/2026

Alaska Recreational Trails Program·Alaska

68% match

RTP Grant Application - Petersville Trails & Rescue Center (Ground Breaking Phase III)

Rolling / TBD closeOpened 9/24/2026

Alaska Recreational Trails Program·Alaska

67% match

RTP Grant Application - Girdwood Beaver Pond Trail

Rolling / TBD closeOpened 9/24/2026

Illinois Natural Resources·Illinois

67% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

Alaska Recreational Trails Program·Alaska

67% match

RTP Grant Application - Bonita Loop

Rolling / TBD closeOpened 9/24/2026

Kenosha County·Wisconsin

67% match

Pike Mountain Bike Trail Restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

California Grants·California

67% match

Grants and Cooperative Agreements Program (GCA)- G25

Rolling / TBD closeOpened 3/6/2025

Alaska Recreational Trails Program·Alaska

66% match

RTP Grant Application - Grooming Snowmachine Acquisition

Rolling / TBD closeOpened 9/24/2026

Illinois Department of Transportation·Illinois

66% match

Transportation Alternatives Program - Metropolitan Planning Organization +200,000 population selected

Closes 12/18/2026Opened 10/19/2026

City of Green Bay·Wisconsin

66% match

Pike Hike Mountain Bike Trail restoration and Improvements

Closes 11/5/2026Opened 10/9/2026

California Grants·California

65% match

2026 Solutions for Congested Corridors Program

Closes 11/19/2026Opened 9/30/2026

City of Gainesville - Procurement Division·Florida

65% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026

Connecticut Energy & Environmental Protection·Connecticut

64% match

REQUEST FOR INFORMATION REGARDING BICYCLE RENTALS CONCESSION

Closes 11/20/2026Opened 10/23/2026

City of Seattle·Washington

64% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

Snohomish County·Washington

64% match

Snohomish County Regional Trail Coalition Participation and Coordination Services

Closes 11/12/2026Opened 10/21/2026

California Grants·California

64% match

Tahoe for All

Closes 12/19/2026Opened 9/17/2025

U.S. Department Of Transportation·Hawaii

64% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Virginia Department of Transportation·Virginia

64% match

B29_2027 SMART SCALE - CONVERT RAILS TO TRAIL

Closes 11/18/2026Opened 10/14/2026

U.S. Forest Service·United States of America

64% match

Landscape Scale Restoration Grant Program for Non-Federal Lands

Closes 1/26/2027Opened 10/28/2026