Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arkansas
  4. ›Construction
  5. ›SW 2ND AND O STREET STORMWATER IMPROVEMENTS: PHASE 1

City of Bentonville·Arkansas

SW 2ND AND O STREET STORMWATER IMPROVEMENTS: PHASE 1

Closes 9/8/2026$100k – $300kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bentonville is seeking bids for Phase 1 of the SW 2nd and O Street stormwater improvements. The work entails installing approximately 245 linear feet of storm sewer pipe along with required junction boxes and inlets, and completing associated civil works such as traffic and erosion control, demolition, tree and fence removal/re‑installation, and the reconstruction of curb, gutter, pavement, driveways, and sidewalks to restore disturbed areas. This is a standard‑size municipal infrastructure project that will require a licensed contractor familiar with Arkansas construction regulations and capable of delivering a complete storm‑water conveyance system on a tight schedule. • Install ~245 ft of storm sewer pipe with junction boxes and inlet structures. • Perform demolition, tree removal, fence removal/re‑installation, and related site‑preparation tasks. • Provide traffic/erosion control, and construct curb, gutter, pavement, driveways, and sidewalks to finish disturbed right‑of‑way. • Bids must be sealed, submitted to Lee Beshoner, Olsson, Inc., and accompanied by the required bid security. • Pre‑bid conference optional on August 27, 2026; bid deadline September 8, 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lee Beshoner

[email protected]

Key dates

Opened
8/9/2026
Pre-bid meeting
8/27/2026
Closes
9/8/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
IFB 26-61

Budget estimate

$100,000 – $300,000

Based on typical municipal storm‑water pipe installation costs (≈ $150–$250 per linear foot) plus ancillary civil work (demolition, traffic control, curb/sidewalk construction), the total contract value is likely between $100 K and $300 K. The lower bound assumes minimal ancillary work, while the upper bound reflects full scope with higher‑grade materials and extensive site preparation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Eatonville·Florida

Top match · 73%

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Coronado·California

71% match

First Street Stormwater Pump Station Flood Relief Project

Closes 11/9/2026Opened 9/23/2026

City of Cape Canaveral·Florida

71% match

Stormwater Pilot Project

Closes 11/12/2026Opened 10/15/2026

Jackson County Utility Authority·Mississippi

71% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

City of Charlotte·North Carolina

71% match

Hill Street Storm Drainage Improvement Project

Rolling / TBD closeOpened 8/15/2027

James City County·Virginia

70% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

City of Ketchikan·Alaska

70% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

City of Hattiesburg·Mississippi

70% match

12238 North Main Street Area Infrastructure Improvements - Phase 1 #21158

Closes 11/19/2026Opened 10/16/2026

Nevada Government·Nevada

70% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

City of Charlotte·North Carolina

70% match

Reddman Road Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/17/2026

City of Charlotte·North Carolina

70% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

69% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

City of Lake Oswego·Oregon

69% match

Ash Street and Lund Street – Storm System Improvements Project

Closes 11/5/2026Opened 9/29/2026

Town of South Hill·Virginia

69% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

69% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

Georgia Tift County Board of Commissioners·Georgia

69% match

Water, Street & Drainage Improvements - W Phillipsburg Phase 2

Closes 11/17/2026Opened 10/16/2026

City of South Miami·Florida

69% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

Town of Upton·Wyoming

69% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

City of Charlotte·North Carolina

69% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Coronado·California

69% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Charlotte·North Carolina

69% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Shawnee·Kansas

69% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Clearwater·Florida

69% match

Lower Spring Branch Stormwater Improvements

Closes 12/9/2026Opened 9/30/2026

City of North Charleston·South Carolina

68% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Village of North Palm Beach·Florida

68% match

Buoy Road Stormwater

Closes 11/10/2026Opened 10/8/2026