This public‑works solicitation awards a design‑build, civil‑construction contract to construct a new three‑span haunched box‑girder bridge over the San Dieguito River, realign and widen El Camino Real and Via De La Valle, and perform associated roadway, utility, drainage, traffic‑signal, landscaping, and right‑of‑way work. The project is FHWA‑funded (BHLO 5004(068) – El Camino Real (57C‑0042)) with an estimated construction cost of $65.8 million and a contract period of 1,048 working days (≈ 4 years). Bidders must hold a California Class A contractor’s license, provide a 10 % bid bond, meet extensive prevailing‑wage, Buy‑America, EOCP, and CARB off‑road diesel compliance requirements, and submit a full suite of certifications and de‑barment forms. The procurement includes mandatory pre‑bid meeting (June 5 2026) and mandatory site‑visit (June 9 2026).
• 3‑span haunched box‑girder bridge and associated sub‑structure/ super‑structure work.
• Realignment and widening of El Camino Real, utility installations (water, sewer, storm‑drain), traffic‑signal upgrades, and landscaping.
• Full compliance requirements: Class A licensing, 10 % bid bond, performance and labor‑and‑material bonds, prevailing‑wage (DIR/Davis‑Bacon), Buy‑America, EOCP (MBE/WBE/DBE etc.), CARB diesel fleet regulation, and extensive certification packets.