The Alleghany Highlands Public Schools are soliciting qualified contractors to design, supply, and install approximately 900 linear feet of HDPE storm‑drain piping at the Alleghany High School site, including all associated civil works and site restoration. The project encompasses complete scope from mobilization through final testing and record drawings, ensuring compliance with local utility markings, permits, and erosion‑control requirements. The contractor will be responsible for demolition, trenching, shoring, pipe bedding, backfill, pavement replacement, landscaping, and final reinstatement of site areas.
• 900 lf of HDPE storm‑drain pipe, inlets, and channels
• Full civil‑construction services: utility marking, permits, demolition, shoring, dewatering, trenching, bedding, installation, backfill, compaction, and pavement replacement
• Additional responsibilities: erosion‑control, temporary utility protection, green‑area restoration, testing, and delivery of as‑built drawings