The City of Trenton is seeking a contractor to provide engineering services for the design, bidding, and construction supervision of a water main and ancillary structure to connect Klockner Booster Zone with Booster 3 Zone Hopewell Twp. and improvements to the Klockner Pump Station. The project requires the contractor to perform various tasks, including design, bidding, and construction supervision, and to provide deliverables such as reports, drawings, and manuals. The contractor will be required to comply with the requirements of P.L.1975, c.127, and to submit a fee proposal on a not-to-exceed basis. The project is expected to last for 30 months, and the contractor will be selected based on evaluation criteria, including technical approach, relevant corporate experience, qualifications of the project team, and fee.
• The contractor will be responsible for designing and bidding the project, as well as supervising the construction.
• The contractor will be required to provide deliverables, including reports, drawings, and manuals.
• The contractor will be expected to comply with the requirements of P.L.1975, c.127.
• The contractor will be selected based on evaluation criteria, including technical approach, relevant corporate experience, qualifications of the project team, and fee.
• The project is expected to last for 30 months.
• The contractor will be required to submit a fee proposal on a not-to-exceed basis.