Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Civil Engineering
  5. ›Mason Farm WWTP Bypass Channel Stabilization and Dredging

North Carolina Orange Water and Sewer Authority·North Carolina

Mason Farm WWTP Bypass Channel Stabilization and Dredging

Closes 1/13/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Orange Water and Sewer Authority is seeking a qualified firm to provide professional and engineering services for the design and permitting of stabilization measures for the Morgan Creek bypass channel at the Mason Farm Wastewater Treatment Plant and dredging of the channel. The selected firm will be responsible for hydraulic analysis, erosion evaluation, deposition evaluation, development of plans and specifications, permitting, and construction phase services. The firm must have demonstrated experience and expertise in hydraulic analysis, floodplain and floodway modeling, and design and permitting of channel stabilization and dredging. • The project involves stabilizing erosion and scour on the banks of the Morgan Creek bypass channel. • The firm will provide a written statement of qualifications, including a project team, team experience, project approach, and project schedule. • The selection process will be based on qualifications, and the owner reserves the right to reject any and all proposals. • The project is expected to be completed within a certain timeframe, with a Notice to Proceed expected to be issued on March 2, 2026.

Attached files

Contact

Steven Bailey(Engineering Manager – Capital Projects)

[email protected]

Key dates

Opened
12/5/2025
Questions due
1/5/2026
Closes
1/13/2026

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
460-378-19

Budget estimate

$500,000 – $2,000,000

The budget for this project is likely to be in the range of $500,000 to $2,000,000, considering the scope of work, which includes design, permitting, and construction phase services for the stabilization and dredging of the channel. The actual budget will depend on the qualifications and experience of the selected firm, as well as the complexity of the project. Factors that may influence the budget include the firm's hourly billing rates, the number of hours required to complete the project, and any additional services that may be required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Virginia

Top match · 67%

Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia

Closes 11/23/2026Opened 10/21/2026

St. Louis County, MN - Purchasing Division·Minnesota

66% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

U.S. Department Of Defense·Louisiana

66% match

Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,

Closes 2/5/2027Opened 12/11/2024

U.S. Department Of Defense·Louisiana

66% match

Mermentau River Bar Channel Dredging, Mermentau River – Gulf of America, Maintenance Dredging, #26-1

Closes 10/1/2028Opened 9/1/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

City of Virginia Beach·Virginia

65% match

ARIQCC for Mechanical Dredging and Maintenance of Navigable Waterways and Channels

Closes 11/12/2026Opened 9/23/2026

U.S. Department Of Defense·Georgia

65% match

Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

Massachusetts Department of Fish and Game·Massachusetts

65% match

DMF Municipal Fish Passage Restoration Grant

Closes 2/26/2027Opened 2/26/2024

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

64% match

Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 3-2025, Cameron Parish, Louisiana. Specification Nos. OM25127

Closes 12/4/2026Opened 12/4/2024

U.S. Department Of Defense·Louisiana

64% match

Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 5-2025, Cameron Parish, Louisiana. Specification No. OM25129

Closes 12/4/2026Opened 12/4/2024

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 8-2025 (OM25008)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

U.S. Department Of Defense·Louisiana

64% match

Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging

Closes 3/31/2027Opened 10/5/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

64% match

Freshwater Bayou - Lock to The Gulf, Freshwater Bayou Maintenance Dredging #26-2, ED 26-025

Closes 6/18/2028Opened 6/22/2026