Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Construction
  5. ›SW Eagles Parkway (RTE. AA) - Phase A - Grain Valley, MO

City of Grain Valley·Missouri

SW Eagles Parkway (RTE. AA) - Phase A - Grain Valley, MO

Closes 9/15/2026$500k – $1.2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Grain Valley is soliciting sealed bids for the design‑build of Phase A of the SW Eagles Parkway (Rte. AA) project, which includes a 10‑foot wide ADA‑compliant trail, associated ramps, drainage, earthwork, traffic and erosion control, and related incidental work. The contractor will be responsible for completing construction in accordance with the provided drawings and specifications and must provide a 5 % performance security. The award is expected in October 2026, with work to commence shortly thereafter. • Construct a 10‑ft wide ADA‑compliant trail and associated ramps. • Perform earthwork, drainage, traffic control, and erosion control as detailed in the plans. • Submit a sealed bid by 2 PM on September 15, 2026, accompanied by a 5 % bid bond or certified check. • Comply with prevailing wage rates, safety program requirements, and Missouri labor regulations. • Provide a certified check or bid bond to secure the bid; the City will retain the security until contract execution.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jerry Bollinger(Project Manager)

[email protected]

(317) 492-9173

Key dates

Opened
8/18/2026
Pre-bid meeting
8/27/2026
Closes
9/15/2026
Projected award
10/1/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
TAP-3456(402)

Budget estimate

$500,000 – $1,200,000

The bid likely falls in the mid‑six‑figure range. A 10‑ft wide trail spanning roughly a mile, with earthwork, drainage, ramps, and associated services, typically costs between $500 k and $1.2 M in the Midwest, depending on site conditions, material choices, and labor rates. This estimate assumes standard pavement, moderate grading, and standard safety and permitting costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Haines Borough·Alaska

Top match · 63%

Snow Removal for Historic Dalton Trail (Eagle Vista Subdivision)

Rolling / TBD closeOpened 9/24/2026

U.S. Department Of Transportation·Mississippi

62% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

City of Shawnee·Kansas

62% match

Ordinance No. 3509

Closes 10/22/2030Opened 10/22/2024

City of Shawnee·Kansas

61% match

Ordinance No. 3480

Closes 1/16/2029Opened 1/16/2024

State of Delaware DOT·Delaware

61% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Houston-Galveston Area Council·Texas

61% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

County of Fairfax·Virginia

61% match

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·Missouri

61% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

County of San Luis Obispo·California

61% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3510

Closes 2/5/2027Opened 11/5/2024

Wyoming State Construction Department·Wyoming

60% match

AML Project 87, Phase I – Hanna Roadway Infrastructure Repair - Dept of Environmental Quality

Closes 12/9/2026Opened 10/23/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3490

Closes 6/4/2030Opened 6/4/2024

TOWNSHIP OF WOOLWICH·New Jersey

60% match

Valley Glen Roadway Rehabiliation

Closes 11/10/2026Opened 10/30/2026

U.S. Department Of Transportation·Wyoming

60% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3523

Closes 6/3/2033Opened 6/3/2025

Lucas County Engineer·Ohio

60% match

2026 Springfield Township O.P.W.C. Road Improvement Project, Phase 2

Closes 11/10/2026Opened 10/26/2026

Texas Houston-Galveston Area Council·Texas

60% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3521

Closes 5/20/2031Opened 5/20/2025

U.S. Department Of Transportation·Colorado

60% match

TX FW LGA 10(5) Steve Thompson Wildlife Drive

Closes 11/3/2026Opened 10/1/2026

U.S. Department Of Defense·Louisiana

60% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

Outagamie County·Wisconsin

59% match

Farm Land Lease

Closes 11/9/2026Opened 10/15/2026

Daviess County·Missouri

59% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Missouri Department of Transportation·Missouri

59% match

NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue

Closes 11/18/2026Opened 10/19/2026

Cobb County·Georgia

59% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3519

Closes 4/1/2030Opened 4/1/2025