The project involves repairing and mitigating future failures of the USFS Sand Trail infrastructure, trail number 229, in the Chugach National Forest. The contract aims to install bank armoring with rip rap and place sub-grade aggregate along the trail. The work must be performed during low water times of the year, and the contractor must comply with various regulations and specifications, including those related to environmental protection and labor standards. The contract has a total duration of 238 days, from September 24, 2026, to May 31, 2027.
Some key aspects of the project include:
• The contractor must install bank armoring with rip rap and place sub-grade aggregate along the trail.
• The work must be performed during low water times of the year.
• The contractor must comply with various regulations and specifications, including those related to environmental protection and labor standards.
• The contract has a total duration of 238 days, from September 24, 2026, to May 31, 2027.
• The contractor must provide a bid bond (20%) if the total priced quote exceeds $150,000.
• The contractor must provide performance and payment bonds (100% each) if the award is greater than $150,000.