Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Hampshire
  4. ›Civil Engineering
  5. ›Lebanon Solid Waste Facility - Phase IIIA Excavation and…

City of Lebanon·New Hampshire

Lebanon Solid Waste Facility - Phase IIIA Excavation and Site Preparation

Closes 10/22/2026$2M – $5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Lebanon is seeking a qualified contractor to perform extensive earthwork and site‑preparation activities for Phase III A of its solid‑waste facility. The scope includes excavating overburden, stockpiling soil, constructing a perimeter access road, installing storm‑water management features, and providing erosion‑ and sediment‑control measures. The contract will be awarded to the lowest responsible and qualified bidder and will require performance, bid, and payment bonds, as well as comprehensive insurance coverage. Work must be completed by May 31 2027, with substantial completion required by April 30 2027. • Excavation of approximately 165,000 CY of overburden soil and 6,200 CY for the access road • Construction of a new perimeter access road (≈24,400 CY fill, 8,600 SY gravel) • Installation of temporary and permanent storm‑water diversion structures, culverts, and erosion controls • Stockpiling and later management of excavated material on‑site • Required bonding (5 % bid bond, 100 % performance bond) and insurance (general liability, workers’ comp, automobile, umbrella) • Mandatory pre‑proposal meeting on 29 Sep 2026; questions due 8 Oct 2026; proposal deadline 22 Oct 2026 • Project duration roughly 7 months from award to final acceptance

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chris Kilmer(Assistant Public Works Director)

[email protected]

(603) 442-6109

Key dates

Opened
9/21/2026
Questions due
10/8/2026
Pre-bid meeting
9/29/2026Mandatory
Closes
10/22/2026
Duration
7 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237310
Solicitation №
2026-RFx-059

Budget estimate

$2,000,000 – $5,000,000

Based on the quantities listed (e.g., 165,000 CY of soil excavation, 24,400 CY of fill, 8,600 SY of gravel road, storm‑water structures, and associated labor, equipment, and mobilization), a typical cost for municipal earthwork and road construction in New England ranges from $12‑$30 per cubic yard for bulk excavation and $50‑$120 per square yard for road surface work. Applying these rates yields an estimated contract value between roughly $2 million and $5 million. The lower bound assumes modest unit costs and efficient scheduling; the upper bound reflects higher labor rates, equipment rental, and comprehensive storm‑water control measures.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delaware Solid Waste Authority·Delaware

Top match · 70%

CHERRY ISLAND LANDFILL (CIL) AND PIGEON POINT LANDFILL (PPLF) MANHOLE REHABILITATION – PHASE 2

Closes 12/15/2026Opened 10/28/2026

City of Lebanon·Indiana

69% match

City of Lebanon, IN - 2027 Annual Supply Bids

Closes 11/9/2026Opened 10/16/2026

Michigan Department of Environment, Great Lakes, and Energy·Michigan

69% match

761/19006.SAR; NuWay Cleaners Site - Remedial Excavation

Closes 11/18/2026Opened 10/6/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

69% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/16/2026

Delaware Solid Waste Authority·Delaware

68% match

LANDFILL OPERATIONS AT THE CENTRAL SOLID WASTE MANAGEMENT CENTER

Closes 11/5/2026Opened 9/22/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge (Greater Baton Rouge Airport District)·Louisiana

68% match

Runway 13/31 Safety Area & RPZ Improvements - Phase III Demolition

Closes 11/17/2026Opened 10/13/2026

County of Volusia·Florida

68% match

Professional Solid Waste Management Engineering Services

Closes 12/1/2026Opened 10/27/2026

Michigan Department of Environment, Great Lakes, and Energy·Michigan

68% match

761/19006.SAR; NuWay Cleaners Site - Remedial Excavation

Closes 11/18/2026Opened 10/29/2026

City of Tustin·California

67% match

Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)

Closes 12/10/2026Opened 10/28/2026

Erie County·New York

67% match

ERIE COUNTY SEWER DISTRICT NO. 3 SOUTHTOWNS ADVANCED WASTEWATER TREATMENT FACILITY PHASE 2 EXPANTION CONTRACT NO. 75

Closes 11/19/2026Opened 9/22/2026

U.S. Department Of Defense·United States of America

67% match

Region 7 Southeast Mines Superfund Site

Closes 11/6/2026Opened 10/21/2026

San Bernardino County·California

67% match

Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill

Closes 11/12/2026Opened 10/27/2026

Greenville County·South Carolina

66% match

CLASS 2 LANDFILL PARTIAL CLOSURE

Closes 11/16/2026Opened 10/23/2026

University of South Carolina – Lancaster·South Carolina

66% match

USC Lancaster - Gregory YMCA Site Improvements

Closes 11/12/2026Opened 10/14/2026

City of Lebanon·Indiana

66% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

Town of Church Point·Louisiana

66% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Southwest Ohio Regional Transit Authority·Ohio

66% match

Chemical & Contaminant Fluid & Waste Removal

Closes 11/13/2026Opened 10/23/2026

Louisiana Office of State Procurement·Louisiana

66% match

*Mand Site*Waste Disposal Svcs -DOC/LCIW

Closes 11/17/2026Opened 10/23/2026

Atlantic County Utilities Authority, NJ·New Jersey

66% match

Develop Solid Waste Conversion Facility at the Atlantic County Utilities Authority

Closes 12/9/2026Opened 10/13/2026

City of Seattle·Washington

66% match

Solid and Liquid Waste Disposal

Closes 11/23/2026Opened 10/9/2026

Greenville County·South Carolina

66% match

Class 2 Landfill Partial Closure

Closes 11/16/2026Opened 10/23/2026

Town of Kershaw·South Carolina

66% match

Kershaw Cemetery Road Paving, Phase 3

Closes 11/10/2026Opened 10/26/2026

City of Toledo·Ohio

66% match

RACM Demolition Debris Disposal Site- REBID

Closes 11/10/2026Opened 10/23/2026

U.S. Department Of Defense·Alabama

66% match

SOLID WASTE REMOVAL AND DISPOSAL

Closes 2/26/2027Opened 2/26/2026

U.S. Department Of Defense·United States of America

66% match

FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base, Japan

Closes 11/16/2026Opened 7/21/2026