Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Pioneer Avenue over Lone Tree Creek Bridge Replacement…

County of Stanislaus·California

Pioneer Avenue over Lone Tree Creek Bridge Replacement Project

Closes 8/5/2026$100k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The County of Stanislaus is seeking competitive bids to replace the existing two‑span bridge on Pioneer Avenue over Lone Tree Creek. The scope includes demolition of the existing structure, installation of a temporary creek diversion, construction of a new single‑span reinforced‑concrete bridge supported by cast‑in‑steel‑shell piles, rock‑slope protection, roadway reconstruction, traffic control, and associated environmental mitigation. The contract is estimated at under $2 million and will be awarded to the lowest responsible bidder after a public bid opening on August 5, 2026. • Demolition, removal, and disposal of the existing bridge and associated utilities. • Construction of a new 45‑ft single‑span bridge with CISS piles, abutments, and wingwalls per Caltrans 2025 standards. • Required environmental compliance: Section 401 water‑quality certification, USACE NWP, and CDFW Incidental Take Permit for California tiger salamander. • Project schedule: Notice to Proceed by Jan 18 2027, then 98 working‑day construction period, with specific interim deadlines for tree removal (Feb 1 2027) and pile work (Mar 1 2027).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Vickey Dion(Public Works)

[email protected]

Key dates

Opened
6/16/2026
Questions due
7/29/2026
Closes
8/5/2026
Projected award
11/3/2026
Duration
98 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
2026-200012

Budget estimate

$100,000 – $200,000

The contract’s estimated construction cost is about $2 million. Assuming a typical contractor profit margin of 5‑10 % after covering labor, materials, bonds, and overhead, the net earnings for the prime contractor would likely fall between $100,000 and $200,000. This range reflects uncertainties such as subcontractor scope, potential change orders, and the requirement for environmental mitigation credits.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Benewah County·Idaho

Top match · 71%

Charlie Creek Road over Santa Creek Bridge Replacement 30090-117

Closes 11/19/2026Opened 10/30/2026

City of St. Louis·Missouri

71% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Town of Pulaski·Virginia

70% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Missouri Department of Transportation·Missouri

70% match

NW District, Daviess County, construction of a 97’-7 7/8” long, single span, W40x235 Steel I-Girder bridge at 20-degree L.A. skew and 3.5% grade, located on Forest Avenue

Closes 11/18/2026Opened 10/19/2026

Daviess County·Missouri

70% match

Daviess County: Bridge Replacement - Bridge No. 3960007; BRO-R031 (002); Forest Avenue

Closes 11/18/2026Opened 10/16/2026

Minnesota Department of Administration·Minnesota

69% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

Cherokee Nation·Oklahoma

69% match

Bridge 67 over Pecan Creek (Coos Thompson)

Closes 11/10/2026Opened 10/5/2026

City of St. Louis Board of Public Service·Missouri

69% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Oregon Department of Transportation·Oregon

69% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

City of Alexandria·Louisiana

69% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

Shawnee County·Kansas

69% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

U.S. Department Of Agriculture·California

69% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

69% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

68% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

California Department of Transportation·California

68% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Roanoke City Government·Virginia

68% match

SOL1342, Wiley Drive Low Water Bridge Replacement

Closes 11/4/2026Opened 9/23/2026

Georgia City of Chattahoochee Hills·Georgia

68% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

City of Charlotte·North Carolina

68% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

NYS Cambria, Town of·New York

68% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

BREC·Louisiana

68% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Cherokee Nation Department of Transportation & Infrastructure·Oklahoma

68% match

Bridge 67 over Pecan Creek – CN‑0938‑23BR

Closes 11/10/2026Opened 10/5/2026

City of Columbia·Missouri

68% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026