Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›MAIN STATION EAST CONCRETE REPLACEMENT

City of Cincinnati·Ohio

MAIN STATION EAST CONCRETE REPLACEMENT

Closes 10/13/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Cincinnati is soliciting bids for the replacement of concrete pavement at the Main Station East entrance of the Greater Cincinnati Water Works. The work includes demolition of existing concrete, excavation, placement of new concrete pavement, joint sealants, pavement markings, and related site restoration. The contractor must be registered in the City’s Vendor Self‑Service system, provide a bid bond (minimum 10 % of bid), and a performance bond equal to 100 % of the contract value. All work must be completed within 150 calendar days after the notice to begin work, with liquidated damages of $1,000 per day for delays. The project is classified as a Heavy Highway public‑improvement contract and is subject to prevailing‑wage and minority‑/women‑owned business participation requirements. • Scope: Concrete removal, excavation, new concrete placement, joint sealing, pavement markings, site cleanup. • Location: 2545 Riverside Drive, Cincinnati, OH 45202 (Main Station East). • Bid submission: Electronic only via VSS, due 10/13/2026 12:00 PM ET. • Site visit (optional): 10/05/2026 2:00 PM ET. • Bonds: 10 % bid bond; 100 % performance bond. • Schedule: Start within 5 days of notice; complete within 150 days. • Compliance: Prevailing‑wage (determination 61547489), M/WBE participation, insurance, safety, and environmental requirements.

Attached files

Contact

Alexa Kafury(Buyer)

[email protected]

Key dates

Opened
10/8/2026
Site visit
10/5/2026
Closes
10/13/2026
Duration
150 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
ITB-306-273C909396-2

Budget estimate

$500,000 – $2,000,000

The solicitation does not disclose a contract value. Based on comparable municipal concrete‑pavement replacement projects (typically 5,000–10,000 sq ft at $100–$200 per sq ft), the total bid is likely to fall between $500,000 and $2,000,000. Factors influencing the range include the exact pavement area, site conditions, required demolition, prevailing‑wage rates, and any additional utility or traffic‑control work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Niagara Frontier Transit Authority (NFTA)·New York

Top match · 64%

10LZ2413 - LRRT Capital Repairs 2026

Closes 11/17/2026Opened 10/27/2026

City of Wilton Manors·Florida

63% match

Lift Station No. 1 Replacement

Closes 11/2/2026Opened 9/30/2026

City of Frazee, MN·Minnesota

62% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

Port of Portland·Oregon

62% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

City of Charlotte·North Carolina

62% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

Metropolitan Council·Minnesota

61% match

Notice of Intent to Solicit Blue Line Franklin Station Renovation

Closes 11/20/2026Opened 10/14/2026

City of Laguna Beach·California

61% match

Old Top of the World Lift Station Rehabilitation - Phase II

Closes 11/10/2026Opened 10/9/2026

Virginia Railway Express·Virginia

61% match

IFB 027-002 Woodbridge Station East Elevator Modernization

Closes 11/17/2026Opened 9/18/2026

City of Melbourne·Florida

61% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

City of Fort Wayne·Indiana

61% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Raleigh Durham Airport Authority·North Carolina

61% match

Runway 5R-23L and T1 Apron Pavement Rehabilitation

Closes 11/9/2026Opened 9/30/2026

City of Orlando·Florida

60% match

Lift Station No. 85 Replacement

Closes 12/4/2026Opened 10/26/2026

City of Wilton Manors·Florida

60% match

Lift Station No. 7 Replacement

Closes 11/23/2026Opened 10/22/2026

City of Charlotte·North Carolina

60% match

Terminal Roof and AHU Replacements

Closes 1/1/2027Opened 8/12/2026

New York City Department of Design and Construction·New York

60% match

HWCB27KR: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Georgia City of College Park·Georgia

60% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

60% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

City of Wilton Manors·Florida

60% match

2027-05 Lift Station No. 5 Replacement

Closes 12/2/2026Opened 10/28/2026

Eden Prairie Schools·Minnesota

60% match

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026

New York City Department of Design and Construction·New York

60% match

HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Bangor·Maine

60% match

P27-36 Curb Replacement BGR

Closes 11/18/2026Opened 10/23/2026

Nyc Department of Design and Construction·New York

60% match

85027B0026 - HWCB27KR : REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

Port of Portland·Oregon

59% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

City of Irving·Texas

59% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

Miami-Dade County Fire Rescue·Florida

59% match

MDFR Fire Station 35 New Four-Fold Xt Exterior Doors

Closes 11/12/2026Opened 10/16/2026