The Miami‑Dade County Water and Sewer Department seeks a qualified contractor to relocate residential water meters from rear/side locations to the front of homes, installing new service lines, backflow devices, and restoring the disturbed areas. The contractor must secure all required permits, coordinate inspections, and ensure full compliance with county and state licensing requirements. The project covers multiple residential properties across the county and is valued at approximately $3.5 million, with a 280‑day construction window.
• Disconnect existing meters and install new front‑of‑property meters and service lines (excavation, pipe, valves, backflow preventers).
• Perform pressure testing, disinfection, concrete backfill, and landscaping restoration to equal or better condition.
• Obtain and manage all plumbing/electrical permits, schedule inspections, and secure owner signatures for approvals.
• Provide required licenses (General Contractor or Master Plumber), three project references, insurance, bid bond, and E‑Verify compliance.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.