The City of Port Arthur is seeking bids for the repair of utility cuts on flexible base streets. The contract involves repairing utility cuts on flexible base streets, with the winning bidders being LD Construction and CMM Construction Co., Inc. The total cost of the contract is $400.00 for LD Construction and $360.00 for CMM Construction Co., Inc. The contract is expected to be performed in the city of Port Arthur, Texas. Key aspects of the contract include the repair of utility cuts, flexible base streets, and the total cost of the contract.
• The contract is for the repair of utility cuts on flexible base streets
• The winning bidders are LD Construction and CMM Construction Co., Inc.
• The total cost of the contract is $400.00 for LD Construction and $360.00 for CMM Construction Co., Inc.
• The contract is expected to be performed in the city of Port Arthur, Texas