This solicitation calls for the demolition of the existing pier connecting the Best Western Plus Coastline Inn to Wilmington’s Riverwalk, including removal of utilities, structural components, and subsequent site restoration. The work must be performed under strict environmental, safety, and MW‑BE subcontracting requirements, with a total contract period of 90 days from mobilization. The City of Wilmington will award the contract through an open competitive bidding process, with a firm‑fixed‑price arrangement and a mobilization payment structure (up to 5 % of total contract amount).
• Scope includes complete removal of timber and steel pier elements, utility disconnections, concrete pad demolition, back‑filling, new concrete placement, and site grading/seed‑ing.
• Contractor must provide erosion‑control measures (turbidity curtains, debris booms), obtain all required permits, coordinate with multiple utilities, and submit detailed schedules, safety plans, and a hurricane preparedness plan.
• MWBE participation is required (minimum 14 % of prime contract value), and liquidated damages of $250 per day apply for any delay beyond the 90‑day completion window.