The contract is for the design and construction of the Dunn Water Reclamation Facility Filtration and Disinfection Improvements Project. The project consists of two phases, with Phase 1 including the design and preparation of 70% complete construction documents, and Phase 2 including the preparation of 100% complete construction documents and construction of the project. The contract amount is $1,270,796.00 for Phase 1, and the lump sum price for Phase 2 will be established in a separate amendment. The contract includes provisions for performance and payment bonds, insurance requirements, and change orders.
• The project includes the design and construction of a new filtration and disinfection facility.
• The contract requires the vendor to provide performance and payment bonds, as well as insurance to cover workers' compensation and general liability.
• The contract includes a provision for change orders, which must be approved by the owner in writing.
• The vendor is required to provide a lump sum price proposal for Phase 2, which will be based on the previous cost estimates provided.
• The contract includes a provision for liquidated damages, which will be assessed if the vendor fails to complete the work within the specified timeframe.