The Accessible Curb Ramp Improvement Project 2020 involves the removal and replacement of concrete curb, gutter, and/or sidewalk, as well as the construction of sidewalk curb ramps. The estimated construction cost for this project is $720,000, and the contractor must have a General Engineering Contractor license. The project is overseen by the County of Sacramento, and the contract was awarded to FBD Vanguard Construction, Inc. with a total bid of $755,740.00. The key aspects of this project include:
• Removal and replacement of concrete curb, gutter, and/or sidewalk
• Construction of sidewalk curb ramps
• Estimated construction cost of $720,000
• Requirement for General Engineering Contractor license
• Awarded to FBD Vanguard Construction, Inc. with a total bid of $755,740.00