The S135 (Atkins Drive) Pump Station Repair Project involves the repair of a pump station, with a scope of work that includes furnishing all labor, materials, tools, and equipment. The project has an engineer's estimate of $1,914,054.00 and was awarded to Steve P Rados Inc with a bid of $1,962,000.00. The project includes a mandatory pre-bid conference and a site visit. Key points to consider:
• The project requires a Class A license.
• The project has a mandatory pre-bid conference and site visit.
• The project has an engineer's estimate of $1,914,054.00.
• The project was awarded to Steve P Rados Inc with a bid of $1,962,000.00.